How much does it cost for a HDB flat whole house renovation?

A whole house renovation depends on the works needed and done for the whole unit. 


It can be as straight forward as hacking, tiling, carpentry, rewiring and painting. Or as complex as adding customized niche for the house aesthetics, conceal wiring, plastering, ceiling works and very customized carpentry works for the whole house.


Let’s take a 5 room HDB resale unit as an example. 


For the hacking and tiling of the whole house can cost about: 

  • $30,000 more or less, inclusive limited carpentry for the kitchen, painting and minor electrical works

When you add on rewiring which can cost about:

  • $3500 minimum

Plastering: 

  • $3950 minimum

Windows and grilles estimated at 150 sqft: 

  • $2250 and $1500 respectively

 

Including Main door, bedroom doors and air con, this can add up to be a substantial amount. We have not gotten to the carpentry works for the other areas of the house yet.


It can be frightening when you add it all up. This is why majority of renovations firms bait you in with a cheap renovation package. They know add-ons are inevitable. But you don’t. Agreeing to commit for a cheap package is easy. Only after you are halfway into it do you realize you need to spend more. And you cannot back out of it already. Now you are spending money that you didn't want to and likely also spending money that you don’t have.


There is a way out of this if you are realistic from the start, and try to understand each quote that you get by scrutinizing the descriptions more closely. 


After all this, you still need to have enough money for your kitchen equipment and home furnishings. This is why i would strongly recommend to choose a comprehensive renovation package that may have included sanitary fittings into it. This can greatly reduce your cost by a couple of thousand dollars.


For a comprehensive quote of your whole house renovation works, please approach us for a no obligation discussion and quotation. We will share cost breakdown with you and also timeline required.  

 

We are committed to the success of your home renovation.

Published on  Updated on  

What Our Customers Say

"

Sandy reached out to us through our online contact form. She had wanted to revamp the entire unit, and prepare it for retirement. This project was managed by Aidil, our Project manager and coordinated by one of our coordinators who had left us.

Click for more
"

One of our past clients moving into a larger unit for their growing family. From their kitchen revamp , rewiring, adding a room, extensive carpentry works up to coordinating their air con and blinds installation. Glad that we were given the opportunity to serve them again.

Click for more
"

Suzana helped her parents arrange & coordinate their kitchen renovation. They were skeptical at first after a not to good experience with their kitchen cabinets. Aidil managed to put their fears at ease and over delivered again on the works done.

Click for more
"

My wife and I would like to thank you and your team for turning our house into a place we called home. Despite our difficult requests or complicated designs, you push through to make it happen. Even things like our skylight for example, its something new to you but you made it happen too. Although there are hiccups in the initial stage, your leadership and workmanship are solid and without questions. We understand its part and parcels and nothing is perfect after rectifying every small little things and details for us. We couldn't be happier and we are grateful that you managed to cater to us no matter how difficult we can be. We also want to take this opportunity to apologies for any shortcoming or any inconvenience cause.

Click for more
"

When Yasin came across our website, he decided to take up our 2 Toilets Resale Package. He also wanted to hack the living and balcony wall, while levelling up his balcony with living. There were some delays when HDB didn't approve the balcony wall hacking and top up of balcony even after 2 weeks. He kept checking the online submission, and at the same time called HDB's officer in charge to check on the delay. Eventually, HDB gave us the go head and project was completed without any further delays.

Click for more
×

Your product grid title

Browse All