IMPORTANT PRICING NOTICE ⚠️


Market prices vary. For a whole house renovation, check our packages or request a custom quote. It is best to prepare at least 10 percent of your property value. For example, if your home is worth $400,000, plan around $40,000 to cover all major works and avoid overspending.


Get Pricing Get Pricing

How to Budget for a Toilet Renovation in Singapore

Toilet Renovation Singapore

Budgeting for a toilet renovation Singapore project can be overwhelming, especially with hidden costs and unclear pricing from contractors. This comprehensive guide provides expert strategies, real pricing data from licensed contractors, and proven tips to help you successfully plan your HDB or condo bathroom renovation.

Understanding Your Toilet Renovation Singapore Needs

Before allocating your budget, start by categorizing your renovation requirements into must-haves and nice-to-haves. This prioritization prevents overspending while ensuring essential upgrades get completed.

Essential vs. Optional Upgrades

Must-Have Essentials:

  • Waterproofing and leak repairs (prevents structural damage to your unit and neighbors below)

  • Functional plumbing and drainage systems compliant with PUB standards

  • Proper ventilation to combat Singapore's high humidity levels

  • Safety features like non-slip tiles and grab bars for elderly family members

Nice-to-Have Upgrades:

  • Smart toilet technology with heated seats, bidet functions, and auto-cleaning

  • Premium designer tiles from Italian or Spanish brands

  • Spa-like features such as rain showers, body jets, and heated flooring

  • Custom vanity cabinets with integrated LED lighting and storage solutions

This classification helps you allocate funds strategically, ensuring critical repairs receive priority over aesthetic enhancements.

Setting a Realistic Toilet Renovation Budget Singapore

Transparent Pricing: What You Should Expect

Based on verified data from Renovation Contractor Singapore, professional toilet renovation costs in Singapore range significantly depending on property type and renovation scope.

Actual Toilet Renovation Package Prices

Package Type Exact Price Timeline Best For
2 Toilets BTO - Standard (Overlay) $9,990 5-6 days New BTO flats within 3-year warranty
2 Toilets BTO - Premium (Overlay) $10,390 5-6 days BTO with designer finishes
2 Toilets Resale - Standard (Overlay) $11,490 5-7 days Resale flats, quick renovation
2 Toilets Resale - Standard (Hacking) $11,990 2-3 weeks Resale flats needing waterproofing
2 Toilets Resale - Premium (Overlay) $11,990 5-7 days Upgraded materials, resale units
2 Toilets Resale - Premium (Hacking) $12,590 2-4 weeks Complete transformation


Prices verified from RCS Toilet Packages as of December 2025

Combined Kitchen + Toilet Packages (Best Value)

Package Type Exact Price Savings
5RM Kitchen + 2 Toilets BTO - Standard $18,390 Save $1,600+ vs separate
5RM Kitchen + 2 Toilets BTO - Premium $18,990 Save $2,400+ vs separate
5RM Kitchen + 2 Toilets Resale - Standard (Overlay) $24,490 Save $3,000+ vs separate
5RM Kitchen + 2 Toilets Resale - Standard (Hacking) $24,990 Save $3,500+ vs separate
5RM Kitchen + 2 Toilets Resale - Premium (Overlay) $25,490 Save $4,000+ vs separate
5RM Kitchen + 2 Toilets Resale - Premium (Hacking) $25,990 Save $4,500+ vs separate


Combined packages offer 15-25% better value than renovating separately

What's Included in the $9,990 Standard Package

Understanding exactly what you get prevents confusion and ensures you're comparing apples-to-apples when evaluating contractors.

Complete Inclusions (No Hidden Costs)

 Tiling Works:

  • Complete floor and wall tile overlay covering 250 sqft per toilet

  • Professional tile cutting and installation

  • Waterproof grouting and sealing

 Fixtures & Fittings:

  • 2x Premium WC units (toilet bowls) with complete installation

  • 2x Modern bidet sets with professional mounting systems

  • 2x Designer basin units including quality mixer taps

  • 2x Advanced rainshower systems with thermostatic mixers

 Water Heater:

  • Efficient 20L storage heater installation and testing

  • Proper electrical connection by licensed electrician

 Accessories Package:

  • Toilet roll holders

  • Towel bars and hooks

  • Soap dishes

  • Robe hooks

 Professional Services:

 Project Management:

  • Daily WhatsApp progress updates

  • Timeline tracking

  • Quality control inspections

  • 12-month comprehensive workmanship warranty

View complete package details and book consultation

Budget Allocation Strategy: The 15% Contingency Rule

Smart homeowners allocate 10-15% of total budget as contingency for unexpected issues like hidden water damage, structural repairs, or price adjustments during renovation.

Sample Budget Allocation for $10,000 Toilet Renovation

Category Percentage Amount What It Covers
Tiling (45%) Materials & installation $4,500 Tiles, adhesive, grout, labor
Plumbing & Fixtures (25%) Sanitary ware, piping $2,500 WC, basin, shower, pipes
Waterproofing (12%) Professional application $1,200 Membrane, testing, warranty
Carpentry (10%) Vanity, storage $1,000 Custom cabinets, mirrors
Miscellaneous (8%) Accessories, painting $800 Hooks, bars, ceiling paint
Contingency Reserve (15%) Safety buffer $1,500 Unexpected issues
Total Budget $11,500 All-inclusive


This structured approach prevents budget overruns and financial stress during renovation.

Comparing Renovation Methods: Overlay vs. Hacking

Choosing between overlay and complete hacking significantly impacts your budget, timeline, and renovation outcomes.

Overlay Method: Cost-Effective & HDB-Approved

What is overlay? New tiles are installed directly over existing surfaces without removing old tiles.

Advantages:

  • 30-40% cost savings compared to hacking

  • Faster completion: 5-6 working days for 2 toilets

  • HDB-approved for BTO flats within 3-year warranty period

  • Minimal disruption: Family remains at home during renovation

  • Preserves waterproofing: Original membrane stays intact

Best for:

  • BTO flats less than 3 years old (mandatory per HDB regulations)

  • Budget-conscious homeowners

  • Quick cosmetic upgrades

  • Structurally sound bathrooms

RCS Pricing:

  • BTO 2 Toilets (Standard): $9,990

  • BTO 2 Toilets (Premium): $10,390

  • Resale 2 Toilets (Standard): $11,490

  • Resale 2 Toilets (Premium): $11,990

Complete Hacking: Total Transformation

What is hacking? All existing tiles and finishes are removed down to concrete, enabling complete redesign.

Advantages:

  • Addresses underlying water damage and structural issues

  • Enables complete layout reconfiguration

  • Modern waterproofing ensures long-term protection (80% of failures prevented)

  • Electrical and plumbing upgrades improve safety standards

  • Suitable for resale flats with aging infrastructure

Best for:

  • Resale flats older than 15+ years

  • Major layout changes required

  • Serious water damage, leaks, or mold issues

  • Complete bathroom transformation desired

Timeline: 2-4 weeks depending on customization

RCS Pricing:

  • Resale 2 Toilets (Standard Hacking): $11,990

  • Resale 2 Toilets (Premium Hacking): $12,590

Learn more about overlay vs. hacking methods

Understanding HDB Toilet Renovation Rules

Compliance with HDB regulations prevents fines, legal issues, and costly rectifications.

Critical HDB Regulations You Must Know

1. The 3-Year Waterproofing Protection Rule

BTO flat owners cannot hack or remove tiles for 3 years from key collection. Violating this voids your waterproofing warranty and may result in fines up to $5,000.

  • Compliant solution: Use HDB-approved overlay method

  • Why this rule exists: Protects waterproofing membrane preventing leaks to lower floors

  • What happens if violated: Mandatory restoration at your expense + fines

2. Mandatory HDB Renovation Permits Required For:

  • Hacking or replacing wall/floor tiles (after 3-year period)

  • Extending bathroom areas beyond original boundaries

  • Raising floor levels in bathrooms

  • Structural modifications

Application timeline: 2-4 weeks processing
Work deadline: 3 months for BTO, 1 month for resale

3. Renovation Hours Restrictions:

  • Allowed: 9am-6pm on weekdays and Saturdays

  • Noisy work prohibited: After 5pm

  • Banned completely: Sundays and public holidays

4. HDB Registered Contractor Requirement:

All bathroom renovations must be performed by HDB Registered Renovation Contractors (RRCS) listed in the official Directory.

Complete HDB bathroom renovation rules and restrictions

Getting Multiple Quotes: Smart Comparison Strategy

Obtaining 3-5 detailed quotations from licensed contractors helps you understand market rates and identify hidden costs.

What to Look for in Contractor Quotes

Essential Quote Components:

  • ✅ Itemized breakdown of all materials and labor

  • ✅ Clear project timeline with milestone dates

  • ✅ Warranty coverage details (minimum 12 months)

  •  HDB permit application handling included

  • ✅ Insurance and HDB RRCS licensing credentials

Red Flags to Avoid:

  • ❌ Vague "all-inclusive" quotes without itemization

  • ❌ Requests for large upfront deposits (>30%)

  • ❌ Significantly lower quotes likely excluding WC units, accessories

  • ❌ No warranty or insurance coverage offered

  • ❌ Unlicensed contractors offering "cash deals"

Verified Contractor Comparison

Factor RCS Competitor A Competitor B
2 Toilets Package $9,990 $8,888* $10,500
Timeline 5-6 days 7-10 days 5-7 days
Warranty 12-24 months 6 months 12 months
Hidden Costs None - Transparent +$1,500-2,000 +$800-1,200
Fixtures Included ✅ All (WC, basin, shower) ❌ *Excludes WC units ⚠️ Basic only
HDB Licensed ✅ Since 2017 ✅ Yes ⚠️ Verify
Daily Updates ✅ WhatsApp + photos ❌ Upon request ⚠️ Limited


Competitor A's "$8,888" package excludes essential WC units, bidet sets, and premium fixtures - actual cost becomes $10,388-11,888

Request transparent quotation from RCS

DIY vs. Professional: When to Save, When to Invest

While DIY approaches seem budget-friendly, 67% of DIY bathroom projects in Singapore require professional rectification, often costing $5,000-$15,000 in fixes.

Safe DIY Tasks (Minimal Risk)

You can handle:

  • Shopping for accessories (towel bars, soap dispensers, decorative hooks)

  • Selecting tiles and fixtures with contractor guidance

  • Simple touch-up painting after completion

  • Installing small decorative wall elements

Estimated DIY savings: $200-$500

Professional-Only Tasks (Critical for Safety & Compliance)

Always hire licensed professionals for:

 Waterproofing application - Improper application causes 80% of renovation failures, leading to structural damage and neighbor disputes

 Electrical work - DIY violations are dangerous, illegal, and void insurance claims. Licensed Electrical Workers required.

 Plumbing modifications - All water and sanitary works must be performed by PUB Licensed Plumbers as mandated by law

 Structural hacking - Improper tile removal risks building integrity and waterproofing damage

 HDB permit applications - Complex regulatory requirements with strict compliance standards

Cost of DIY failures: $5,000-$15,000 in professional rectification work

Pro tip: False economy from DIY often leads to expensive fixes, permit violations, and voided warranties.

Hire HDB-licensed RRCS professionals for guaranteed compliance

Smart Budget-Saving Strategies Without Compromising Quality

1. Choose Overlay Over Hacking (When Feasible)

Save 30-40% by selecting overlay method for structurally sound bathrooms. Perfect for BTO flats and recent resale units.

Savings example:

  • Hacking package: $12,590

  • Overlay package: $11,490

  • You save: $1,100 per renovation

2. Opt for Package Deals vs. À La Carte

All-inclusive packages eliminate price negotiation and reduce per-item costs by 15-25%.

Package advantage:

  • Everything bundled: tiles, fixtures, labor, permits, cleanup

  • No surprise add-ons during project

  • Predictable final cost

View all-inclusive toilet packages

3. Bundle Kitchen + Toilet Renovations

Combined packages offer exceptional value - save $1,600 to $4,500 compared to separate renovations.

Best value example:

4. Select Mid-Range Quality Materials

Ceramic and porcelain tiles ($3-6 per sqft) offer excellent durability without premium import pricing.

Material cost comparison:

  • Basic local ceramic: $2.50-4.00 per sqft

  • Mid-range 300x600mm tiles: $3.00-6.00 per sqft (included in RCS packages)

  • Premium imported tiles: $8.00-15.00+ per sqft

5. Minimize Layout Changes

Keeping existing plumbing locations saves $1,000-$2,500 in piping relocation and floor hacking costs.

Why location matters:

  • New pipe routing requires floor penetration

  • Additional waterproofing needed

  • Increased labor and materials

  • Extended project timeline

6. Optimal Renovation Timing

Best months: February-April offer:

  • Lower humidity for faster material curing

  • Better contractor availability

  • Potentially faster project completion

  • Reduced monsoon complications

Monitoring Your Spending: Budget Tracking System

Staying within budget requires disciplined expense tracking throughout the renovation process.

Effective Budget Monitoring Approach

Weekly Expense Tracker:

  • Record all material purchases with receipts

  • Log contractor milestone payments

  • Note any scope changes or additions

  • Compare actual vs. budgeted costs

Payment Milestone Structure (Industry Standard):

  • 30% deposit upon contract signing

  • 40% progress payment at 50% project completion

  • 30% final payment upon satisfactory inspection and handover

Never pay full amount upfront - protects against contractor abandonment and ensures quality completion.

Red flag warning signs:

  • Contractor requesting >50% upfront

  • Vague explanations for cost increases

  • Lack of progress despite payments

  • Poor communication or transparency

Investing in trending features enhances property value while ensuring your renovation remains relevant for years.

Top Toilet Renovation Trends

1. Sustainable Eco-Friendly Materials & Fixtures

Environmental consciousness drives modern renovations:

  • WELS-rated fixtures (Water Efficiency Labelling Scheme) - mandatory 2-tick minimum per PUB regulations

  • Dual-flush toilets saving 20-30% water consumption annually

  • LED lighting reducing electricity costs by 60%

  • Recycled glass tiles and bamboo accents

  • Low-VOC paints for healthier indoor air quality

2. Smart Bathroom Technology Integration

Modern convenience features gaining popularity:

  • Smart toilets with heated seats, bidet functions, auto-cleaning

  • Motion-sensor faucets improving hygiene and water efficiency

  • Digital shower controls with temperature memory presets

  • Smart mirrors with LED lighting, defog, weather displays

  • Heated flooring controlled via smartphone apps

  • Voice-activated controls for hands-free operation

3. Minimalist Space-Saving Designs

Maximizing Singapore's compact HDB bathroom spaces:

  • Floating vanities creating visual floor space

  • Wall-mounted toilets simplifying cleaning routines

  • Scandinavian-inspired clean lines and neutral palettes

  • Multi-functional fixtures maximizing limited space

  • Vertical storage solutions

4. Spa-Like Luxury Features

Bringing resort experiences home:

  • Rainfall showerheads and body jets

  • Thermostatic shower controls for consistent temperature

  • Natural stone accents (marble, granite)

  • Soft ambient LED lighting creating relaxation

  • Aromatherapy-enabled ventilation systems

5. Bold Artistic Tiles as Statement Pieces

Designer tiles creating visual impact:

  • Moroccan and geometric patterned feature walls

  • Mosaic accent walls in shower niches

  • Textured tiles (fluted, ribbed, 3D stone-look)

  • Contrasting grout colors for visual interest

  • Large format tiles (300x600mm) for modern aesthetics

6. Aging-in-Place Accessibility Features

Future-proofing bathrooms for elderly residents:

  • Barrier-free walk-in showers with zero thresholds

  • Strategically placed grab bars maintaining elegant design

  • Non-slip R10+ rated flooring throughout

  • Comfort-height toilets reducing physical strain

  • Lever-style handles requiring less hand strength

Explore design trends with professional consultation

Comprehensive Toilet Renovation Checklist

Ensure nothing gets overlooked with this complete planning checklist adapted from RCS renovation guide.

Pre-Renovation Phase (2-4 Weeks Before)

✅ Define renovation goals and must-have features
✅ Set realistic budget with 15% contingency reserve
✅ Research and shortlist 3-5 HDB-licensed RRCS contractors
✅ Obtain multiple detailed itemized quotations
✅ Verify contractor HDB RRCS registration and insurance
✅ Review past project portfolios and customer testimonials
✅ Finalize design concept and material selections
✅ Apply for HDB renovation permit (2-4 weeks processing)
✅ Notify neighbors of upcoming renovation schedule
✅ Arrange temporary bathroom access if renovating both toilets
✅ Clear bathroom of all personal items and valuables

During Renovation Phase (5-6 Days Overlay / 2-4 Weeks Hacking)

✅ Ensure protective coverings for adjacent living areas
✅ Conduct regular site visits to monitor progress
✅ Verify waterproofing membrane application before tiling
✅ Confirm 24-48 hour water ponding test completion
✅ Test all plumbing connections for leaks
✅ Inspect tile alignment, spacing, and grouting quality
✅ Confirm electrical fixtures meet safety standards
✅ Address any concerns immediately with project manager
✅ Document progress with dated photos at each milestone
✅ Verify daily debris removal and site cleanliness

Post-Renovation Phase (Final Week)

✅ Conduct thorough final walkthrough inspection
✅ Test all fixtures individually (toilet flush, basin taps, shower, heater)
✅ Check for proper ventilation and exhaust fan operation
✅ Verify all accessories properly mounted and secure
✅ Inspect waterproofing around wet areas (no water pooling)
✅ Confirm no visible cracks, chips, or installation defects
✅ Request defect rectification list with timeline
✅ Retain all warranty documents, receipts, and permits
✅ Schedule post-renovation deep cleaning if needed
✅ Test bathroom for 7 days before final payment

Download detailed renovation checklist

Common Toilet Renovation Budget Mistakes to Avoid

Learn from others' costly errors to protect your investment.

Mistake #1: Inadequate Contingency Planning

The problem: Allocating 100% of available funds leaves no buffer for surprises like hidden water damage, price fluctuations, or scope additions.

The solution: Always maintain 10-15% contingency reserve. For a $10,000 budget, set aside $1,000-1,500 for unforeseen issues.

Mistake #2: Choosing Lowest Quote Without Investigation

The problem: Rock-bottom quotes often exclude essential items (WC units, accessories) or use inferior materials, resulting in $1,500-2,000 surprise costs.

The solution: Focus on value-per-dollar rather than lowest price. Compare itemized quotes carefully. Verify what's included vs. excluded.

Example: Competitor's "$8,888" package excludes WC units ($600-1,200), bidet sets ($200-400), and premium fixtures - actual cost becomes $10,088-11,888, more expensive than RCS's transparent $9,990 all-inclusive package.

Mistake #3: Ignoring Waterproofing Quality

The problem: Cutting corners on waterproofing leads to expensive leak repairs within 1-2 years, costing $3,000-8,000 in rectification.

The solution: Invest in professional-grade waterproofing with:

  • Complete membrane coverage on floors and walls

  • Proper 3-7 day curing time

  • Mandatory 24-48 hour water ponding test

  • Minimum 12-month warranty coverage

Industry fact: Poor waterproofing causes 80% of toilet renovation failures in Singapore.

Mistake #4: Overlooking HDB Permit Requirements

The problem: Starting renovation without proper permits results in:

  • Stop-work orders from HDB

  • Fines up to $5,000

  • Mandatory restoration at your expense

  • Voided insurance claims

The solution: Engage HDB-licensed RRCS contractors who handle all permit applications correctly. Verify contractor's RRCS registration before signing contracts.

Mistake #5: Poor Payment Structure

The problem: Paying too much upfront (>50%) gives contractors leverage to delay, cut corners, or abandon projects.

The solution: Follow industry-standard milestone payments:

  • 30% deposit upon contract signing

  • 40% at 50% completion with verified progress

  • 30% upon satisfactory final inspection only

Never release final payment until:

  • All defects rectified

  • Water ponding test passed

  • All fixtures tested and working

  • Warranty documents provided

Mistake #6: Neglecting to Verify Contractor Credentials

The problem: Unlicensed contractors cannot:

  • Apply for HDB permits legally

  • Provide valid warranties

  • Meet insurance requirements

  • Guarantee work quality

The solution: Always verify:

  • HDB RRCS registration in official Directory

  • PUB Licensed Plumber credentials

  • Valid business registration and insurance

  • Track record of completed projects

Verify RCS's HDB licensing and credentials

Toilet Renovation Financing Options Singapore

For larger budgets exceeding immediate cash availability, explore financing solutions.

Personal Renovation Loans

Major banks offer:

  • Loan amounts: Up to $30,000 per application

  • Interest rates: From 3.45% per annum (subject to credit assessment)

  • Repayment terms: Flexible 1-5 years

  • Approval timeline: 1-3 working days for pre-approved customers

Top banks offering renovation loans:

  • DBS Renovation Loan

  • OCBC Home Renovation Loan

  • UOB Personal Loan

  • Maybank Renovation Loan

  • Standard Chartered CashOne

HDB Renovation Loan

For HDB flat owners:

  • Integrated with HDB renovation permit approval process

  • Direct contractor payment option simplifies transactions

  • Competitive interest rates for eligible applicants

  • Loan amount based on flat value and income assessment

Credit Card Installment Plans

0% interest installment options:

  • Some contractors and material suppliers offer 6-12 month plans

  • Check with your credit card provider for eligibility

  • Useful for smaller renovation amounts ($3,000-10,000)

Important: Calculate total cost including interest before committing to financing. Ensure monthly repayments fit comfortably within your budget.

Small HDB Bathroom Space Optimization Strategies

Singapore's compact bathrooms demand creative design solutions maximizing functionality without sacrificing aesthetics.

Space-Saving Fixtures and Storage Solutions

Floating Vanities:

  • Create visual floor space instantly

  • Provide storage without bulk

  • Easier floor cleaning

  • Modern aesthetic appeal

  • Typical cost: $1,200-2,500

Wall-Mounted Toilets:

  • Save 15-20cm floor space

  • Simpler cleaning routines

  • Contemporary look

  • Concealed cistern

  • Installation cost: $800-2,000

Corner Installations:

  • Maximize usable areas

  • Efficient use of dead space

  • Corner basins, shower enclosures

  • Saves 20-30% floor space

Built-In Storage:

  • Recessed wall niches in shower areas

  • Mirrored cabinets serving dual purposes

  • Under-sink vanity storage

  • Vertical shelving maximizing wall space

Lighting Design for Small Bathrooms

Strategic lighting makes compact bathrooms appear larger and brighter:

Layered Lighting Approach:

  • Ambient lighting: Ceiling-mounted LED panels or downlights

  • Task lighting: Vanity mirror lights for grooming

  • Accent lighting: LED strips under floating vanities

Design tips:

  • Use bright white LED (5000-6000K) for spacious feel

  • Install lights strategically to eliminate shadows

  • Mirror placement amplifies light reflection

  • Avoid single harsh overhead lights

Explore small bathroom design solutions

Toilet Renovation Timeline: What to Expect

Understanding realistic timelines helps you plan around work schedules, family needs, and contractor availability.

BTO Overlay Method Timeline: 5-6 Working Days

Day 1-2: Demolition & Preparation

  • Careful fixture removal (toilet, basin, accessories)

  • Surface preparation and cleaning

  • Protective coverings for adjacent areas

  • Daily debris disposal

Day 3-4: Tiling & Waterproofing

  • Tile overlay installation (floor first, then walls)

  • Waterproofing application at wet zones

  • Grouting and sealing

  • Quality control checks

Day 5-6: Fixture Installation & Finishing

  • Plumbing fixture installation (WC, basin, shower)

  • Water heater connection and testing

  • Accessory mounting (towel bars, hooks)

  • Chemical washing and final cleaning

  • System testing and handover

Total: 5-6 working days for standard 2-toilet packages

Resale Hacking Method Timeline: 2-4 Weeks

Week 1: Complete Hacking & Structural Work

  • Removal of all existing tiles and fixtures (2-3 days)

  • Structural repairs if needed (1-2 days)

  • Waterproofing membrane application (1 day)

  • 24-48 hour water ponding test

Week 2: Tiling & Carpentry

  • Floor screeding and leveling (1-2 days)

  • Floor tile installation (2-3 days)

  • Wall tile installation (2-3 days)

  • Grouting and sealing (1 day)

Week 3: Plumbing & Electrical

  • Plumbing rough-in and pipe replacement

  • Electrical point installations

  • Vanity cabinet installation

  • Ceiling painting

Week 4: Final Fixtures & Testing

  • Sanitary fixture installation

  • Water heater connection

  • Accessories mounting

  • Comprehensive system testing

  • Final cleaning and handover

Total: 2-4 weeks depending on customization complexity

Learn more about renovation timelines

Why Choose Renovation Contractor Singapore (RCS)

Verified Credentials & Experience

 HDB Licensed RRCS - Official registration in Directory of Renovation Contractors since 2017
 BCA Registered - Full building authority compliance for all renovation works
 BizSafe3 Certified - Workplace safety standards ensuring secure work environments
 300+ Completed Projects - Proven track record across BTO and resale flats
 8+ Years Experience - Deep understanding of Singapore's unique renovation challenges

Transparent Business Practices

 Zero Hidden Costs - All-inclusive pricing with complete itemized breakdowns
 Fixed Package Prices - $9,990 for 2 toilets BTO as advertised, no surprise add-ons
 Detailed Quotations - Every material, fixture, and labor cost clearly specified
 Written Warranties - 12-24 month comprehensive workmanship coverage
 Daily Progress Updates - WhatsApp photos and timeline tracking via Google Calendar

Professional Project Management

 5-Phase Structured Process:

  1. PLAN - Detailed quotation, 3D drawings, timeline establishment

  2. PREP - Site preparation, material procurement, permit submission

  3. FINALISE - Final confirmations, color selections, schedule coordination

  4. BUILD - Daily updates, quality inspections, timeline tracking

  5. COMPLETE - Final walkthrough, warranty documentation, post-support

 Guaranteed Timelines - 5-6 days for overlay, 2-4 weeks for hacking
 In-House Teams - No subcontracting ensures quality control
 Responsive Communication - Quick response to queries and concerns

Customer Satisfaction

 High Recommendation Rate - Trusted by 1000+ Singapore homeowners
 Transparent Reviews - Verified testimonials from actual customers
 After-Sales Support - Continued assistance throughout warranty period
 Free Consultation - $300 value design consultation included

Read customer testimonials and reviews

Conclusion: Your Path to Successful Toilet Renovation Singapore

Budgeting for a toilet renovation in Singapore involves strategic planning and informed decision-making:

 Understanding your needs - Prioritize must-haves vs. nice-to-haves based on lifestyle
 Setting realistic budgets - Packages from $9,990 with 15% contingency reserve
 Knowing renovation methods - Overlay ($9,990-11,990) vs. hacking ($11,990-12,590)
 Understanding HDB rules - 3-year tile protection, permits, RRCS requirements
 Getting multiple quotes - Compare 3-5 transparent, itemized proposals
 Choosing licensed contractors - Verify HDB RRCS registration and credentials
 Monitoring spending - Track expenses with milestone payment structure
 Working with professionals - Avoid costly DIY failures and permit violations

With careful planning and the right contractor partnership, you can achieve a beautiful, functional, compliant bathroom renovation within your budget.


Ready to Start Your Toilet Renovation Singapore Project?

Contact Renovation Contractor Singapore Today

📞 Phone/WhatsApp: +65 9237 5770

🌐 Website: renovationcontractorsingapore.com

📧 Email: rcs@renovationcontractorsingapore.com

📍 Office: 31 Woodlands Close #03-06, Singapore 737855

Available Toilet Renovation Packages:

 2 Toilets BTO Standard - $9,990 - Best value for new flats
 2 Toilets BTO Premium - $10,390 - Designer finishes upgrade
 2 Toilets Resale Overlay - $11,490 - Quick renovation
 2 Toilets Resale Hacking - $11,990-$12,590 - Complete transformation
 Kitchen + 2 Toilets Combo - From $18,390 - Maximum savings

What's Included:

✅ Complete tiles, fixtures, fittings, accessories
✅ HDB permit application handling
✅ Daily WhatsApp progress updates
✅ 12-24 month comprehensive warranty
✅ Professional debris removal & cleaning
✅ Free $300 design consultation
✅ Zero hidden costs guarantee

View All Toilet Renovation Packages →

Get Free Consultation →


Related Helpful Guides:

Published on  Updated on  
 IMPORTANT PRICING NOTICE ⚠️

Market prices fluctuate. Check our official packages for real-time pricing or reach out for custom quotes designed around your needs.

Get Pricing Get Pricing

What Our Customers Say

"

Adi was referred to us by his past colleague. He reached out to RCS and requested a consultation at his place for his 2 toilets revamp. We discussed what his main concern was and what he and his family were looking to achieve from their toilet renovation other than a beautiful and functional toilet. We addressed their concern for the aesthetics, and also the maintenance and upkeeping in future. They were very patient throughout the renovation while staying inside. And the end result gave us satisfaction in delivering the project. While their review says it all giving us the validation and fulfillment we need to continue on this mission. Reach out to us if you'd like to see the results of his toilet renovation.

Click for more
"

We met Afiq & wife at their parents place in Bukit Batok. From the first appointment to the handover, they were a very nice couple to work with. Afiq even recommended his sister which we renovated their place in Punggol Way as well.

Click for more
"

We renovated for Aisyah her family home in early 2020. Since then, we've done a few of her friends's home, her mum's place and also her auntie's place. Grateful that we've been given the chance to keep serving her family & friends.

Click for more
"

Trusted contractor And very reasonable price for my home renovation upgrade. Puan Ana also did kitchen flooring overlay, whole house vinyl and also painting.

Click for more
"

Very decisive couple. Huiying contacted us a few days before going for their holiday. She discovered our 2 toilets overlay package online and found that it was very competitive. We quickly send her the quote and she chose the tiles while choosing to opt for expoxy grouting. We did their place in record time eventhough epoxy grouting needed more time to lay. Happy that we've delivered over their expectations.

Click for more
"

Mas had been enquiring for a few months before deciding to proceed with their renovation. The main works were done to the kitchen & 2 toilets. We faced some hiccups with the sink supplier, although managed to pull through with the timeline. Very happy to have been able to serve them for their long awaited update, as they were very careful on who they picked to renovate their home. Making it a very fulfilling years of wait.

Click for more
×

Your product grid title

Browse All