A standard timeline for a HDB renovation will depend on the work needed. 

For example, let’s take a simple BTO kitchen cabinet package

After confirmation with your chosen renovation firm, you’ll need to choose the materials like laminate and quartz. 


Depending on whether you already have something in mind or just going to think about it, this can take anywhere from: 


Choosing of materials for kitchen cabinet

  • 3 days to up to 2 weeks for fickle minded homeowners


While going through this process, homeowners can already send their chosen laminate designs to renovation firm for them to start the drawing. Some renovation firm provides the 3D rendering. You’ll need to confirm with yours about it. 


The 3D rendering can take another: 


3D rendering

  • 3 days to 1 week. 

If you need to change the laminate designs, this can take up more time deciding on the final design to be used for your kitchen cabinet. While the process is taking place, the base of the kitchen cabinet can already be constructed and electrical points extended. 


For this to happen, decision on the layout of your kitchen cabinet would have been made. 


Base construction takes only: 

  • 1 day

Electrical works should also take only 

  • 1 day

After this it’s the taking of measurements for your kitchen cabinet. Once measurements, finalizing the layout and choosing laminate designs are done, fabrication can take:

  • 2 to 3 weeks

When fabrication is completed, delivery and installation can take another: 

  • 1 to 2 days

Followed by countertop measurement to installation another: 

  • 3 to 5 days

And finally its the installation of your electrical connections, switches and installation of your sink and tap. Considering that there is no glass backing for your kitchen cabinet. If there is the whole process will take longer. 


For renovation works that requires other trades as well like hacking, masonry, plastering, rewiring and more. Please check with us again for the complete breakdown of the works and timeline. 

We are committed to the success of your home renovation.  

Contact RCS Team
RCS – Renovation Contractor Singapore
HDB Licensed • BCA Registered • bizSAFE Level 3 • PMI Member
 IMPORTANT PRICING NOTICE ⚠️

Market prices fluctuate. Check our official packages for real-time pricing or reach out for custom quotes designed around your needs.

Get Pricing Get Pricing

What Our Customers Say

"

Ms Hung contacted us through our facebook contact form for her renovation. We discussed briefly through whatsapp, quoted her and made a site visit to the unit. After that, we met again at our office to straighten some final details and we commenced with her renovation. She even did blinds and curtains with us.

Click for more
"

We engaged Renovation Contractor Singapore (RCS) to fully renovate our two toilets, and I highly recommend them to anyone looking for reliable and quality renovation services. I'm already looking forward to engaging them again when I get my own flat in the future. This was first renovation experience and doing it for my elderly parents made it even more stressful. However, it turned out to be a smooth and fuss-free process from the start to finish, all thanks to Aidil. He was professional, reassuring, responsive, and incredibly helpful throughout the entire journey. The project was completed well ahead of schedule, with excellent workmanship an no surprise costs - completely different from the horror renovation stories we've all heard. I had approached two other companies for quotes, but Aidil stood out from the beginning. He took the time to understand our needs during the initial meeting and remembered every detail. There was little to no issues during the renovation. Aidil was always quick to step in and resolve anything that came up. His team also showed strong expertise in their respective areas - especially the tiler and painter. It's cleat that Aidil and his team take pride in their work; they don't just aim to complete the job, but to do it with care and high standards.

Click for more
"

Naufal contacted us through our social ads. He was upgrading from a MOP unit to a larger one. It was right smack in the middle of Covid era, and his project was the first one we did after getting permission from BCA to resume work. It was not easy, although we managed to pull it off.

Click for more
"

Mr Patrick, was looking to retire here. He had just spent some time living in Australia, and decided to come back here to rest. He was a pleasant person to work with, and only took under 5mins to decide on his choice of tiles for his kitchen, bathroom and toilet. As always, we completed his renovation way ahead of schedule.

Click for more
"

Thank U so much for the services rendered. We love the wardrobes. I love my room especially. It's so inviting and cozy, for me. The extension of the table serves as the sleeping spots for my fur babies.

Click for more
"

Riduan enquired with us since a year ago, and was looking to let his HIP complete first before deciding to renovate. He was referred to us by one of our friends that we did some works for previously. The project consists pf hacking his whole house flooring, revamp of his kitchen, rewiring, some other minor works and helping him to coordinate the air con installation.

Click for more
×

Your product grid title

Browse All