IMPORTANT PRICING NOTICE ⚠️


Market prices vary. For a whole house renovation, check our packages or request a custom quote. It is best to prepare at least 10 percent of your property value. For example, if your home is worth $400,000, plan around $40,000 to cover all major works and avoid overspending.


Get Pricing Get Pricing

Bedroom Renovation Singapore 2026: Cost, Packages & Deals

Bedroom Renovation Singapore 2026
RCS – Renovation Contractor Singapore
HDB Licensed • BCA Registered • bizSAFE Level 3 • PMI Member

The 2026 Reality: What's Changed and Why You Need to Know

Construction costs in Singapore are rising 5-7% in 2026 according to JLL forecasts. That means the bedroom renovation you're planning today could cost SGD 2,000-3,500 more by Q2 2026 if you wait.

But here's the good news: If you book your project now at 2025 rates, most reputable contractors (like RCS) will honor those prices even if your execution happens in 2026.

This guide provides 2026 market forecasts combined with validated 2025 pricing so you can make an informed decision right now.


Part 1: The 2026 Bedroom Renovation Cost Landscape

Market Forecast for 2026:

  • Labor costs: Up 5-7% across the industry

  • Material costs: Stable but at higher baseline (vinyl now $3.50-$6.50 psf baseline, up from $3.00-$5.50 in 2024)

  • Demand: Expected to remain high (Singapore's 90%+ homeownership drives continuous renovations)

  • Timeline: Projects taking 8-12 weeks (increased coordination needed)

Master Bedroom in 2026: Budget Estimates

Low-End (Quality Budget): SGD 8,000 - 10,000

  • 6-foot sliding wardrobe: $2,040

  • Queen platform bed: $2,500

  • Vinyl flooring (150 sqft): $600

  • LED lighting: $900

  • Painting + hacking: $950

  • Contingency: $500

Mid-Range (Recommended): SGD 10,000 - 15,000

  • 8-foot sliding wardrobe: $2,800

  • Queen platform bed (premium): $3,000

  • Vinyl flooring (160 sqft premium): $900

  • Feature wall (basic): $2,000

  • LED cove lighting: $1,200

  • Painting + finishes: $1,100

  • Contingency: $1,000

Premium (Luxury Condo): SGD 18,000 - 28,000

  • 10-foot walk-in wardrobe: $4,000

  • King platform bed (luxury): $4,500

  • Premium tile flooring (hacking): $2,500

  • Premium feature wall: $4,000

  • Smart lighting + control: $2,000

  • Interior design consultation: $2,500

  • Contingency: $2,000


Part 2: The Validated Component Prices (2026 Forecast)

All prices below are based on RCS 2025-2026 official guides and industry benchmarks.

Carpentry Components

Component 2025 Price 2026 Forecast % Change
Sliding Wardrobe (per ft) $320-350 $335-375 +5%
Casement Wardrobe (per ft) $300-340 $315-360 +5%
Walk-in Wardrobe (per ft) $240-380 $250-400 +5%
Queen Platform Bed $2,500 $2,625-2,750 +5-10%
King Platform Bed $4,500 $4,725-4,950 +5-10%
Feature Wall (basic) $1,500-2,500 $1,575-2,625 +5%

Flooring Components (Supply + Installation)

Material 2025 Price (psf) 2026 Forecast (psf) Notes
Premium Vinyl (5mm) $3.50-6.50 $3.70-6.85 Overlay method, no hacking
Homogenous Tile $9.00-12.00 $9.45-12.60 Includes hacking & screeding
Engineered Wood $15.00+ $15.75+ Premium, high-maintenance

Real Example for 2026:

  • Master Bedroom (150 sqft) with vinyl overlay

  • 2025 Cost: $525-$975

  • 2026 Cost: $555-$1,028

  • Additional cost: ~$30-50


Electrical & Lighting (2026 Forecast)

Item 2026 Price Range Includes
LED Cove Lighting Setup $900-1,400 Installation, dimmer, LED strips, labor
Smart Lighting Upgrade $1,500-2,500 Voice control, automation, app integration
Basic Ceiling Lights $300-500 2-3 recessed lights, wiring
Power Socket Addition $100-150 per unit Installation, wiring, testing

Part 3: 2026 Package Offerings (Real, Bookable Products)

Option A: 5-Room Resale Renovation (Full House)

Most popular for comprehensive bedroom renovations

Standard Package (2026 Pricing): SGD 31,290 - 35,000

  • Includes: Full vinyl flooring throughout, kitchen cabinetry, 2 bathroom renovations, painting

  • Master Bedroom component: ~SGD 5,500-6,500 (included)

  • Timeline: 8-10 weeks

  • Warranty: 12 months comprehensive

Premium Package (2026 Pricing): SGD 41,590 - 46,000

  • Includes: Full hacking of old tiles, premium materials, complete master bedroom transformation

  • Master Bedroom component: ~SGD 8,000-9,500 (included)

  • Timeline: 10-12 weeks

  • Warranty: 12 months + 24-month follow-up

Browse 2026 5-Room Packages


Option B: 4-Room Resale (Updated 2026)

For smaller families or focused renovations

Standard Package: SGD 30,490 - 35,000

  • Includes: Flooring, kitchen, 1 bathroom, master bedroom wardrobe (6ft), painting

  • Master Bedroom focus: Yes, includes wardrobe + flooring

  • Timeline: 7-9 weeks

Premium Package: SGD 38,000 - 44,000

  • Includes: Full hacking, premium materials, enhanced master bedroom with feature wall

  • Master Bedroom focus: Heavy, includes 8ft wardrobe + feature wall + LED lighting

  • Timeline: 9-11 weeks

View 4-Room 2026 Details


Option C: Standalone Master Bedroom in 2026

If only renovating the bedroom

Build-Your-Own Package Components:

  1. Base Carpentry: 8ft wardrobe + hacking = SGD 2,800 + $600 = SGD 3,400

  2. Flooring: Vinyl for 150 sqft = SGD 550-975

  3. Lighting & Electrical: LED cove + 2 points = SGD 1,200

  4. Painting & Finishes: = SGD 600

  5. Contingency (10%): = SGD 755

Total Standalone: SGD 7,305 - 8,130
(Cheaper than full house because you're not coordinating across multiple rooms)


Part 4: Quality Standards for 2026 (What to Demand)

Before any 2026 renovation, ensure your contractor confirms these specifications:

Materials:

 Plywood: Solid, not chipboard or MDF (check warranty terms)
 Laminates: Reputable brands (Lamitak, Jennings, or equivalent)
 Vinyl: Minimum 5mm thickness with wear layer
 Hardware: Soft-closing hinges (standard, not premium add-on)

Workmanship:

 Joinery: No visible gaps or uneven finishes
 Painting: Minimum 2 coats, sand between coats
 Installation: All drawers/doors operate smoothly
 Electrical: Certified installer, licensed work

Warranty:

 Minimum 12 months on all workmanship
 Material defects covered within first 24 months
 Response time: Emergency repairs within 48 hours


Part 5: The 2026 Bedroom Design Forecast

What's Staying (Timeless):

  • Japandi Minimalism (Japanese-Scandinavian hybrid)

  • Neutral Palettes (warm whites, soft grays, natural woods)

  • Smart Storage (hidden solutions, floor-to-ceiling optimization)

  • Quality Textiles (natural fabrics, ethical sourcing)

What's Emerging in 2026:

  • Biophilic Design: More plants, natural light, water features

  • Circular Economy Materials: Recycled metals, reclaimed wood, sustainable vinyl

  • Home Office Integration: Every master bedroom now includes a discreet work zone

  • Sleep Technology: Ventilated bed bases, temperature-regulating fabrics

What's Fading (Avoid):

  • Ultra-dark accent walls (makes rooms feel small)

  • Cold white LED lighting (disrupt sleep cycles)

  • Cheap laminate that yellows (looks dated fast)

  • Overly trendy colors (dated by 2028)


Part 6: 2026 Buying Strategy (Smart Moves)

Move 1: Book Your Quotation NOW

Why: Lock in 2025 pricing. Most contractors honor quoted rates for 6-12 months.

Timeline:

  1. Call RCS this week: +65 8784 8742

  2. Get free quotation (valid for 6 months minimum)

  3. Sign preliminary agreement to lock price

  4. Execute renovation in 2026 on your timeline

Savings: Avoid estimated 5-7% 2026 price increase


Move 2: Choose Your Execution Window

Q1 2026 (January-March): Quieter period, contractors available, faster completion
Q2 2026 (April-June): Peak season, expect delays (2-4 weeks longer)
Q3 2026 (July-September): Medium demand, good balance

Pro Tip: Book for Q1-Q2 execution, even if you sign agreement in December 2025.


Move 3: Bundle Strategy

If Renovating Whole House:
Use a package (5-Room Resale from SGD 31,290). Labor is consolidated, total cost is lower.

If Renovating Only Bedroom:
Build your own from components. Total cost: SGD 7,300-15,000 depending on spec.

Savings: Package approach saves 8-12% vs. individual components.


Part 7: Real 2026 Renovation Scenarios

Scenario 1: The Young Professional (4-Room HDB, Master Bedroom Only)

2026 Investment:

  • 6ft sliding wardrobe: $2,100

  • Queen platform bed (standard): $2,625

  • Vinyl flooring (140 sqft @ $5.50): $770

  • LED cove lighting: $1,200

  • Painting & hacking: $950

  • Contingency: $500

  • Total: SGD 8,145

Timeline: 4-5 weeks
ROI: Increases resale value by SGD 12,000-15,000
Quality Level: Mid-range, will last 15+ years

Contractor: RCS Estimate Here


Scenario 2: The Growing Family (5-Room HDB, Full Renovation)

2026 Investment: Complete 5-Room Package: SGD 35,000-45,000
(This covers entire house including master bedroom)

Master Bedroom Within Package:

  • 8ft wardrobe: $2,800

  • Premium bed platform: $3,000

  • Feature wall: $2,000

  • Premium flooring: $900

  • Smart lighting: $1,500

  • (Integrated into full-house package labor allocation)

Timeline: 9-11 weeks
ROI: Increases property value by SGD 50,000-70,000
Quality Level: Premium throughout


Scenario 3: The Condo Investor (Luxury Master Suite)

2026 Investment:

  • 10ft walk-in wardrobe (premium): $4,500

  • King platform bed (luxury): $4,950

  • Premium tile flooring (180 sqft @ $12): $2,160

  • Feature wall (microcement): $5,000

  • Smart home lighting package: $2,500

  • Interior design consultation: $2,500

  • Contingency: $2,000

  • Total: SGD 23,610

Timeline: 10-12 weeks (complex project)
ROI: Increases rental yield by 15-20% (luxury units command premium rents)
Quality Level: Exhibition-grade


Part 8: Risk Mitigation for 2026

Protect Yourself:

  1. Contract: Demand a written itemized quote (never verbal)

  2. Timeline: Ensure the contract includes start & end dates (penalties for delays)

  3. Payment Terms: Recommend 10% deposit, 40% commencement, 40% completion, 10% final

  4. Warranty: Must include 12-month workmanship + 24-month material defects

  5. Insurance: Verify contractor carries HDB-approved insurance

Red Flags to Avoid:

❌ Contractor asks for 100% upfront
❌ Quote is suspiciously low (50% below market)
❌ No written contract (just a WhatsApp agreement)
❌ No warranty offered
❌ Contractor not HDB-licensed or CaseTrust accredited


Part 9: Your 2026 Bedroom Renovation Checklist

This Month (December 2025):

  •  Call RCS for free consultation: +65 8784 8742

  •  Get written quotation

  •  Review materials & specifications with contractor

  •  Understand payment schedule & timeline

  •  Sign preliminary agreement (locks 2025 pricing)

January 2026:

  •  Finalize design choices & color schemes

  •  Order materials (give 2-3 week lead time)

  •  Arrange temporary housing if needed

  •  Brief neighbors (noise/disruption management)

February-March 2026:

  •  Renovation begins (assuming Q1 booking)

  •  Weekly site visits to monitor progress

  •  Photograph all work stages (documentation)

Completion (4-5 weeks later):

  •  Final walkthrough with contractor

  •  Document any defects (punch list)

  •  Obtain completion certificate

  •  Start 12-month warranty period


Validated RCS Resources for 2026

Official RCS 2026 Guides:

  1. HDB Renovation Packages & Price List Singapore 2026 – Most updated pricing

  2. HDB Renovation Budget 2026: Complete Cost Guide – Detailed breakdown

  3. 4-Room Resale Renovation Singapore 2026 – Specific for 4-room flats

Contact RCS Directly:


Final Word: Your 2026 Bedroom Awaits

The construction industry is moving fast in 2026. Costs are rising, timelines are getting longer, contractor availability is tightening.

The smartest move? Secure your quotation today at 2025 rates. You'll have clarity on exactly what your bedroom transformation will cost, and you'll protect yourself from 5-7% price increases coming in mid-2026.

Your future self—the one enjoying a beautifully renovated bedroom designed for rest, work, and life—will thank you for making this decision now.

Make your first call today. Your sanctuary is closer than you think.


Disclaimer: All prices in this guide are validated against RenovationContractorsSingapore.com 2025-2026 data and industry benchmarks from JLL and Renopedia. Final costs may vary based on site conditions, specific material selections, and design complexity. All quotations are subject to site inspection and detailed assessment.

Updated on  
Contact RCS Team
RCS – Renovation Contractor Singapore
HDB Licensed • BCA Registered • bizSAFE Level 3 • PMI Member
 IMPORTANT PRICING NOTICE ⚠️

Market prices fluctuate. Check our official packages for real-time pricing or reach out for custom quotes designed around your needs.

Get Pricing Get Pricing

What Our Customers Say

"

Sandy reached out to us through our online contact form. She had wanted to revamp the entire unit, and prepare it for retirement. This project was managed by Aidil, our Project manager and coordinated by one of our coordinators who had left us.

Click for more
"

One of our past clients moving into a larger unit for their growing family. From their kitchen revamp , rewiring, adding a room, extensive carpentry works up to coordinating their air con and blinds installation. Glad that we were given the opportunity to serve them again.

Click for more
"

Suzana helped her parents arrange & coordinate their kitchen renovation. They were skeptical at first after a not to good experience with their kitchen cabinets. Aidil managed to put their fears at ease and over delivered again on the works done.

Click for more
"

My wife and I would like to thank you and your team for turning our house into a place we called home. Despite our difficult requests or complicated designs, you push through to make it happen. Even things like our skylight for example, its something new to you but you made it happen too. Although there are hiccups in the initial stage, your leadership and workmanship are solid and without questions. We understand its part and parcels and nothing is perfect after rectifying every small little things and details for us. We couldn't be happier and we are grateful that you managed to cater to us no matter how difficult we can be. We also want to take this opportunity to apologies for any shortcoming or any inconvenience cause.

Click for more
"

When Yasin came across our website, he decided to take up our 2 Toilets Resale Package. He also wanted to hack the living and balcony wall, while levelling up his balcony with living. There were some delays when HDB didn't approve the balcony wall hacking and top up of balcony even after 2 weeks. He kept checking the online submission, and at the same time called HDB's officer in charge to check on the delay. Eventually, HDB gave us the go head and project was completed without any further delays.

Click for more
×

Your product grid title

Browse All