IMPORTANT PRICING NOTICE ⚠️


Market prices vary. For a whole house renovation, check our packages or request a custom quote. It is best to prepare at least 10 percent of your property value. For example, if your home is worth $400,000, plan around $40,000 to cover all major works and avoid overspending.


Get Pricing Get Pricing

HDB Renovation Packages & Price List Singapore 2026 | RCS

HDB Renovation Packages
RCS – Renovation Contractor Singapore
HDB Licensed • BCA Registered • bizSAFE Level 3 • PMI Member

Planning your HDB renovation? Here's transparent pricing from licensed contractors—no inflated estimates, no hidden costs.

Real costs: Most homeowners spend $25,000-$85,000 for complete HDB renovations. BTO kitchen cabinets start from $5,590. Complete resale makeovers: $29,890-$39,390.

All prices verified from Renovation Contractor Singapore (RCS)—HDB licensed with 1,000+ completed projects.

Get Free Quote →


Real Costs: What Homeowners Actually Pay

Based on 1,000+ completed projects (2024-2025):

BTO Renovations

3-Room (60-65 sqm): $25,000 – $50,000 (average: $35,000)
4-Room (85-95 sqm): $35,000 – $65,000 (average: $48,000)
5-Room (110-120 sqm): $45,000 – $80,000 (average: $62,000)

Resale Renovations

3-Room: $40,000 – $70,000 (average: $52,000)
4-Room: $50,000 – $90,000 (average: $68,000)
5-Room: $60,000 – $110,000 (average: $82,000)

Why resale costs more: Demolition, disposal (1-1.5 tons debris), hacking old tiles, fixing hidden damage, upgrading 20-30 year old systems. Adds 25-35% to baseline costs.

View 2026 Renovation Guide →


BTO Packages: Official Pricing

All prices from RCS official website (November 2025). HDB licensed, BCA registered.

Kitchen Cabinet Package

Price: $5,590 (Standard) | $6,190 (Premium)

View Package →

What you get:

  • 20 feet solid plywood cabinets (not particleboard)

  • Quartz countertop (heat resistant to 280°C)

  • Stainless steel sink with tap

  • Soft-close hinges (40,000+ cycle rating)

  • Professional installation

  • 12-month warranty

Why soft-close matters: Used 15-20 times daily = 54,750 times over 10 years. Prevents cabinet stress, eliminates noise, extends hardware life.

Premium upgrade ($6,190): Better laminate, enhanced quartz, premium hardware, handleless options.

Browse Kitchen Packages →


Bathroom Package (2 Toilets)

Price: $9,990 (Standard) | $10,390 (Premium)

View Package →

Critical fact: Poor waterproofing = seepage you won't discover for 6-18 months. Remediation: $10,000-$20,000 plus neighbor disputes.

Professional waterproofing process:

  • 2-3 layer membrane application

  • Entire floor + 1.5m up wet walls

  • 48-hour water ponding test

  • Photo documentation

Complete package includes (both bathrooms):

  • Professional waterproofing tested

  • Anti-slip floor tiles (R10+ rating)

  • Wall tiles to ceiling

  • 2 dual-flush toilets (WELS certified)

  • 2 wash basins with vanity

  • 2 mixer taps

  • 2 rainshower columns

  • 2 bidets

  • Storage heater (15L or 30L)

  • All installation

Browse Bathroom Packages →


Kitchen + Bathroom Combo

Price: $18,390 (Standard) | $18,990 (Premium)

View Package →

Value analysis:

  • Kitchen alone: $11,290

  • Bathrooms alone: $9,990

  • Separate total: $21,280

  • Combo package: $18,390

  • Save: $2,890 (13.6%)

Additional benefits:

  • Timeline: 5-7 weeks (vs 8-10 weeks separate)

  • Single project manager

  • Coordinated materials

  • Unified warranty

  • No coordination hassles

Why 68% of BTO homeowners choose this: Highest satisfaction rate (87%), zero coordination issues, completed on time (94%).

View BTO Packages →


Bare Unit Package

Price: Vinyl $14,290-$17,890 | Tiles $15,790-$20,690

View Package →

Transforms empty BTO shell to move-in ready in 6-8 weeks.

Vinyl vs Tiles decision:

Vinyl ($14,290-$17,890):

  • Warm underfoot

  • Faster installation (2-3 days)

  • Lower upfront cost

  • Good sound absorption

  • Lifespan: 10-15 years

Tiles ($15,790-$20,690):

  • Cooler in tropical climate

  • Lasts 25-30+ years

  • Scratch resistant

  • Easier deep cleaning

  • Higher resale value

30-year cost (4-room, 90 sqm):

  • Vinyl: $6,295 (includes replacement year 15, year 30)

  • Tiles: $2,325 (no replacement needed)

Package includes:

  • Complete flooring throughout

  • Basic kitchen (15 feet cabinets)

  • Both bathrooms complete

  • Fresh paint (2 coats)

  • Essential electrical

  • Move-in ready


Resale Packages: Addressing Hidden Problems

Resale renovation = removing old + fixing hidden issues + upgrading outdated systems.

Overlay vs Hacking: The Critical Decision

Impacts budget by $5,000-$10,000 and timeline by 2-3 weeks.

Overlay Method ($11,490-$29,890 packages):

View Overlay Packages →

New tiles over existing tiles. Floor height increases 10-15mm.

When overlay works:

  • Flat under 15 years old

  • Tiles structurally sound (no hollow sounds)

  • No visible damage

  • No water seepage history

  • Floor level acceptable

Advantages: Faster (saves 1-2 weeks), costs less ($500-$1,500 savings per area).

Limitations: Can't inspect underlying structure, can't verify waterproofing, can't repair hidden damage.


Hacking Method ($11,990-$39,390 packages):

View Hacking Packages →

Complete tile removal, inspect structure, repair issues, fresh waterproofing, new installation.

When hacking essential:

  • Flat 20+ years old

  • Visible tile damage

  • Previous water seepage

  • Planning layout changes

  • Want complete confidence

Real case - Toa Payoh (32 years old):

  • Considered overlay: $24,490

  • Professional recommended hacking

  • Discovered during hacking:

    • Water damage behind tiles: $1,200 repair

    • Corroded pipes ready to burst: $800 replacement

    • Degraded wiring: $600 upgrade

  • Final cost: $26,990

  • Prevented future disasters worth $15,000-$25,000

Professional recommendation:

  • 0-10 years: Overlay suitable (inspect first)

  • 10-20 years: Professional assessment needed

  • 20+ years: Hacking strongly advised

  • 30+ years: Hacking non-negotiable

Read Resale Guide →


Kitchen Renovation (Resale)

Price: $13,990 (Overlay) | $14,390 (Hacking)

View Package →

5-week process:

  • Week 1: Demolition, discovery of hidden issues

  • Week 2: Repairs, infrastructure upgrades

  • Week 3: Waterproofing, tiling

  • Week 4-5: Cabinet installation, connections

Complete package:

  • Demolition and disposal (300-500kg)

  • Waterproofing membrane

  • Floor and wall tiles

  • 20 feet plywood cabinets

  • Quartz countertop

  • Sink and tap

  • Modern electrical (13A grounded)

  • Stainless steel pipes

  • Professional installation

Browse Kitchen Packages →


Whole House Resale Package

Price: $29,890-$31,190 (Vinyl) | $35,590-$39,390 (Hacking)

View Package →

Complete transformation in 10-12 weeks.

Everything included:

  • Complete flooring throughout

  • Full kitchen (20 feet cabinets, countertop)

  • Both bathrooms complete

  • Wardrobes all bedrooms

  • All doors (bedrooms, bathrooms, main gate)

  • Complete painting (Nippon 2 coats)

  • Upgraded electrical

  • Project management

  • HDB permits

  • 12-month warranty

Value analysis:

  • If bought separately: $51,000

  • Package price: $29,890-$39,390

  • Save: $11,610-$21,110 (23-42%)

Why package pricing works: Bulk materials, optimized labor, single setup, coordinated workflows, reduced wastage.

Compare Packages →


Hidden Costs to Budget For

Electrical Upgrades: $3,500-$8,000

For flats 25+ years old, complete rewiring often essential.

When needed:

  • Frequent circuit breaker tripping

  • Old round-pin sockets

  • Insufficient power points

  • Planning multiple aircons

What's involved:

  • New distribution board

  • Replace all cables

  • Add 20-30 power points

  • Upgrade circuits

  • Testing and certification


Plumbing Overhaul: $2,000-$5,000

Galvanized pipes (pre-1990s) corrode, burst without warning.

When needed:

  • Brown/rusty water

  • Reduced pressure

  • Visible corrosion

  • Age 25+ years

What's included:

  • Replace with stainless steel 304

  • Upgrade main inlet

  • Individual shut-off valves

  • Pressure testing

Risk avoided: Pipe burst flooding = $15,000-$30,000 damage.


HDB Permits: $200-$500

Required for hacking, carpentry, plumbing, electrical, structural changes.

Professional advantage: RCS handles all permits, 100% approval rate since 2017.

Understand Permits →


Debris Disposal: $800-$1,500

Typical 4-room generates 1-1.5 tons waste. Can't use HDB chute. Must use licensed disposal.

Professional service: Included in quality packages.


Contingency Budget: 10-15%

By flat type:

  • BTO: 10% (fewer surprises)

  • Resale under 15 years: 10-12%

  • Resale 15-25 years: 12-15%

  • Resale 25+ years: 15%

Common discoveries: Water damage, corroded pipes, outdated wiring, wall repairs, termite damage.

Budget Planning Guide →


Choosing Your Package

Young couple, first BTO, tight budget:
Kitchen + Bathroom Combo ($18,390-$25,990)

Growing family, need everything:
Whole House Package ($29,890-$39,390)

Modernizing older resale:
Whole House Hacking ($35,590-$39,390)

Retirees refreshing:
Overlay Packages ($29,890 vinyl)


2026 Renovation Trends

Smart Home Integration: Pre-wire for automation—lighting, curtains, locks, sound, climate control.

Sustainability: Low-VOC paints (10-15% more, better air quality), water-efficient fixtures, LED lighting, FSC-certified materials.

Open-Concept Living: Remove non-structural walls (kitchen-dining-living). Best for 4-room and 5-room.

Multifunctional Spaces: Work-from-home setups—integrated desks, hidden storage, task lighting, cable management.

Japandi Aesthetic: Light wood tones, clean lines, neutral colors, natural materials. Perfect for HDB space maximization.

Explore Design Trends →


Common Mistakes to Avoid

Choosing Based on Price Alone

$20,000 "whole house" missing: proper waterproofing, quality materials, experienced workers, warranty.

Reality: $30,000 done right lasts 10-15 years. $20,000 cheap + $15,000 fixes (year 3) = more expensive plus stress.

Smart approach: Get 3-4 quotes, compare inclusions, check licensing, review portfolios, choose value not just price.

Verify Contractors →


Insufficient Budget Planning

$30,000 budget but $40,000 features = mid-renovation panic.

Framework:

  1. Determine total available funds

  2. Allocate: essentials 45-50%, comfort 30-35%, aesthetics 10-15%, contingency 10-15%

  3. Make selections before signing

  4. Track costs during renovation


Aesthetics Over Functionality

Gorgeous marble-look tile = slippery when wet = dangerous in humid Singapore.

Function-first:

  • Bathroom flooring: R10+ slip resistance minimum

  • Kitchen countertops: Heat and stain resistant

  • Storage: Match actual belongings

  • Lighting: Task requirements first

  • Door swings: Allow furniture movement


Unrealistic Timeline

Realistic timelines:

  • Kitchen cabinet: 3-4 weeks

  • Bathroom: 3-4 weeks

  • Kitchen + 2 bathrooms: 5-7 weeks

  • Whole house vinyl: 8-10 weeks

  • Whole house hacking: 10-12 weeks

Add 1-2 weeks buffer.


Inadequate Documentation

Essential:

  • Detailed quotation (line-item pricing)

  • Material specifications (brands, models, colors)

  • Timeline with milestones

  • Payment schedule (tied to completion)

  • Warranty terms (written)

  • HDB permit copies

Download Checklist →


Selecting the Right Contractor

Licensing: Non-Negotiable

All HDB contractors must be in Directory of Renovation Contractors (DRC).

Verify:

  1. Ask for HDB license number

  2. Check HDB website DRC listing

  3. Verify current registration

  4. Confirm name matches

Verify HDB Licensing →


Experience Matters

Minimum:

  • 5+ years operation

  • 300+ completed projects

  • Recent portfolio

  • Verifiable reviews

  • Physical office address

Compare Top Contractors →


Communication Excellence

Good signs:

  • Responds within 24 hours

  • Asks detailed questions

  • Explains clearly

  • Written confirmations

  • Welcomes questions

  • Realistic expectations

Warning signs: Days to respond, vague answers, pressure tactics, dismissive, rarely available.


Transparency Required

Complete transparency:

  • Itemized quotations

  • Specific materials (brands, models)

  • Clear inclusions/exclusions

  • Fair payment terms

  • Written warranty

Warning signs: Lump-sum quotes, vague descriptions, "discuss later," large upfront deposits, verbal-only warranty.


Why Choose RCS

Established:

  • Operating since 2017 (8+ years)

  • 1,000+ completed projects

  • Zero failures

  • Perfect HDB compliance

  • Office: 31 Woodlands Close

Licensed:

  • HDB Licensed (verified)

  • BCA Registered

  • Fully insured

  • 100% permit approval rate

Satisfaction:

  • 4.8/5 rating (347+ reviews)

  • 98% satisfaction

  • Strong referrals

  • Real testimonials

Advantages:

  • Total transparency (no hidden costs)

  • In-house teams (consistent quality)

  • 97 packages (fully customizable)

  • Dedicated project manager

  • Daily WhatsApp updates

  • 12-month warranty


Get Started

Contact RCS:

📞 Call/WhatsApp: +65 8784 8742
✉️ Email: rcs@renovationcontractorsingapore.com
🌐 Website: renovationcontractorsingapore.com
🏢 Office: 31 Woodlands Close #03-06, Singapore 737855

Hours: Mon-Sat 9AM-6PM | Sun by appointment

Start Free Consultation →


What You Get Today

✅ FREE Consultation (worth $150)
✅ FREE Site Visit (resale)
✅ FREE 3D Design (worth $300)
✅ Detailed Quotation (48 hours)
✅ Portfolio Access
✅ Customer References

No pressure. No obligations. Professional guidance only.

📱 WhatsApp: +65 8784 8742


FAQs

What's the average cost?
$40,000-$70,000 for complete renovations. BTO costs 20-30% less than resale.

How long does it take?
Kitchen/bathrooms: 3-5 weeks. Combo: 5-7 weeks. Full BTO: 6-8 weeks. Full resale: 8-12 weeks.

Need HDB permit?
Yes, for anything beyond painting. RCS handles all permits at no extra cost.

What's included?
Design, materials, labor, project management, permits, debris removal, cleaning, 12-month warranty.

Overlay or hacking?
Overlay if under 15 years, sound condition. Hacking if 20+ years, damage, seepage, or want confidence.

Contingency needed?
BTO 10%. Resale under 15 years 10-12%. Resale 15-25 years 12-15%. Resale 25+ years 15%.

Renovate on $25,000?
Yes. BTO only. Kitchen + bathrooms $18,390. Basic vinyl $2,500. Painting $2,500. Basic wardrobes $2,500. Total ~$25,500.

Payment terms?
10% deposit, 40% commencement, 40% major works completion, 10% final handover. Never 80%+ upfront.

Verify licensing?
HDB website DRC. Search company name or license number. RCS fully verified.

Warranty coverage?
12-month workmanship. Covers installation defects, material failures, structural issues. Report via WhatsApp, inspector within 48 hours.

Updated on  
Contact RCS Team
RCS – Renovation Contractor Singapore
HDB Licensed • BCA Registered • bizSAFE Level 3 • PMI Member
 IMPORTANT PRICING NOTICE ⚠️

Market prices fluctuate. Check our official packages for real-time pricing or reach out for custom quotes designed around your needs.

Get Pricing Get Pricing

What Our Customers Say

"

Sandy reached out to us through our online contact form. She had wanted to revamp the entire unit, and prepare it for retirement. This project was managed by Aidil, our Project manager and coordinated by one of our coordinators who had left us.

Click for more
"

One of our past clients moving into a larger unit for their growing family. From their kitchen revamp , rewiring, adding a room, extensive carpentry works up to coordinating their air con and blinds installation. Glad that we were given the opportunity to serve them again.

Click for more
"

Suzana helped her parents arrange & coordinate their kitchen renovation. They were skeptical at first after a not to good experience with their kitchen cabinets. Aidil managed to put their fears at ease and over delivered again on the works done.

Click for more
"

My wife and I would like to thank you and your team for turning our house into a place we called home. Despite our difficult requests or complicated designs, you push through to make it happen. Even things like our skylight for example, its something new to you but you made it happen too. Although there are hiccups in the initial stage, your leadership and workmanship are solid and without questions. We understand its part and parcels and nothing is perfect after rectifying every small little things and details for us. We couldn't be happier and we are grateful that you managed to cater to us no matter how difficult we can be. We also want to take this opportunity to apologies for any shortcoming or any inconvenience cause.

Click for more
"

When Yasin came across our website, he decided to take up our 2 Toilets Resale Package. He also wanted to hack the living and balcony wall, while levelling up his balcony with living. There were some delays when HDB didn't approve the balcony wall hacking and top up of balcony even after 2 weeks. He kept checking the online submission, and at the same time called HDB's officer in charge to check on the delay. Eventually, HDB gave us the go head and project was completed without any further delays.

Click for more
×

Your product grid title

Browse All