The Merpati Meadow BTO is a Plus project in Geylang with 438 flats: 33 2-room Flexi (Type 1), 134 2-room Flexi (Type 2) and 271 4-room flats, launched in HDB's November 2026 sales exercise. Prices run from $253,000 to $726,000 before grants, with an estimated wait of 39 months (HDB Annex A).
Most buyers leave one question open: the renovation budget. In HDB's November 2026 tables, only Sembawang Anchor is marked as coming with floor finishes, internal doors and sanitary fittings. Merpati Meadow has no such mark. Budget as if those items are not in the price, and use HDB's own Sembawang Anchor figures as the yardstick for what they cost.
Merpati Meadow at a Glance
HDB lists Merpati Meadow as a Plus project in Geylang town (HDB release, 4 November 2026). Neither the release nor its annexes give a street address, block count or amenity list, so we do not repeat the ones circulating online.
| Flat type | Est. floor area (sqm) | Est. internal floor area (sqm) | Units | Price range, 99-year lease (excl. grants) |
|---|---|---|---|---|
| 2-room Flexi (Type 1) | 40 | 38 | 33 | $253,000 – $300,000 |
| 2-room Flexi (Type 2) | 48 | 46 | 134 | $306,000 – $378,000 |
| 4-room | 89 | 86 | 271 | $545,000 – $726,000 |
Source: HDB Annex A, Table A(1)(a). Floor area includes the air-conditioner ledge.
Plus status brings two rules that matter more than any finish. Owners must meet a 10-year Minimum Occupation Period (MOP), and when they sell, they pay HDB a share of the higher of the resale price and the valuation. For Merpati Meadow that subsidy recovery rate is 8% (HDB release, Table 2). If you expect to sell within about a decade, this is the line to weigh first.
Merpati Meadow Prices: 2-Room Flexi and 4-Room
After grants, HDB puts the 2-room Flexi from $133,000 and the 4-room from $490,000. Those figures assume an Enhanced CPF Housing Grant of $120,000 for the 2-room Flexi and $55,000 for the 4-room (HDB release, Table 3). Treat "from" as a starting point, not your price.
Two price points are easy to mix up. The $253,000 figure is the 99-year lease. Singapore Citizens aged 55 and above can pick a short lease of 15 to 45 years, in five-year steps, and a 15-year 2-room Flexi here is $85,000 to $100,000 (Type 1) or $102,000 to $126,000 (Type 2) (HDB Annex A, Table A(1)(i)). If you see a 2-room Flexi range that starts at $85,000, that is the 15-year lease price, and only a short-lease buyer can get it.
One assumption the tables overturn: a Plus flat is not always cheaper than a Prime one. Merpati Meadow's 2-room Flexi (Type 1) starts at $253,000, while the same type at Toa Payoh Hillside, the Prime project in this launch, starts at $243,000. At the top of the range it flips: $300,000 here against $322,000 there. The 4-room starts lower here, at $545,000 against $558,000 (HDB Annex A).
Against resale, HDB lists nearby 4-room flats transacted at $920,000 to $1,100,000 for 93 to 96 sqm, with about 92 years of lease left. HDB lists no nearby 2-room resale flat to compare against (HDB Annex A, Table A(1)(g)).
Merpati Meadow Waiting Time: 39 Months From Selection
HDB gives an estimated waiting time of 39 months. That is counted from the median month of flat selection for this launch to the median projected completion month of the blocks (HDB Annex A, note @). It is not counted from the application date. HDB has not published a calendar completion date, so any month or year quoted for key collection is not an HDB figure.
Track your place in the queue with our HDB BTO application status guide.
Will Merpati Meadow Flats Come With Flooring?
Based on HDB's tables, plan as if they will not. In Annex A, a "~" mark sits next to Sembawang Anchor alone, with a note that its prices cover the floor finishes, internal doors and sanitary fittings supplied in those flats (HDB Annex A). Merpati Meadow has no such mark. This is our reading of HDB's mark. HDB has not published Merpati Meadow's final handover specification in the release or annexes.
HDB also runs the Optional Component Scheme (OCS). It is opt-in: if you take it, the cost of the optional components is added to the flat price (HDB sales brochure). If you skip it, a contractor supplies the items after key collection.
What are those items worth? HDB prices Sembawang Anchor both with and without them, which gives a rare official figure:
| Sembawang Anchor flat type | With floors, doors, fittings | Without | Difference |
|---|---|---|---|
| 2-room Flexi (Type 1) | $156,000 – $203,000 | $153,000 – $200,000 | $3,000 |
| 2-room Flexi (Type 2) | $178,000 – $245,000 | $175,000 – $242,000 | $3,000 |
| 4-room | $312,000 – $428,000 | $304,000 – $419,000 | $8,000 – $9,000 |
Source: HDB Annex A. Difference is our arithmetic on HDB's figures. These are Sembawang Anchor's numbers, not a quote for Merpati Meadow.
Read it as a rough guide to HDB's cost for a basic set, not a renovation budget. Your own flooring, doors and fittings can cost more or less.
Merpati Meadow Renovation Cost: 2-Room Flexi and 4-Room
For a 4-room, price two cases: a flat that comes with the basics, and one that comes without. Our live 4-room packages cover both:
- 4-room Move-In BTO package: S$7,390 (Most Popular) or S$8,090 (Premium), as listed on 12 November 2026.
- 4-room Bare Unit BTO package (vinyl): S$14,990 for vinyl or S$16,990 for tiles (Most Popular); S$15,990 vinyl or S$17,990 tiles (Premium), as listed on 12 November 2026.
The Bare Unit tier is the one to price if you skip OCS. Check each product page for what it covers before you compare it with the OCS cost. If you are weighing vinyl against tiles, our vinyl flooring packages guide sets out the trade-offs. All our 4-room options sit on the 4-room BTO renovation packages page.
For a 2-room Flexi, we do not sell a package; our BTO packages cover 3-, 4- and 5-room flats only. Our 2-room Flexi BTO renovation guide walks through scope and order of work. OCS is worth a close look here too: HDB's Sembawang Anchor gap for this flat type is $3,000.
Whoever you hire, HDB's Renovation Control Rules 2006 require a contractor from its Directory of Renovation Contractors (HDB). To get a 4-room quote from us, send your flat type and whether you are taking OCS through WhatsApp or the contact form on this site.
What to Do Before Booking in March 2027
- Check your income ceiling. At Merpati Meadow it is $16,000 for a 4-room, $8,000 for a 99-year 2-room Flexi and $16,000 for a short-lease 2-room Flexi (HDB Annex B). Our BTO income ceiling guide explains how household income is counted.
- Note the dates. HDB will tell applicants their queue positions in January 2027, and flat booking will tentatively start in March 2027 (HDB Annex B).
- Decide on OCS before you book. Get a 4-room package price for the bare-unit case, compare it with the OCS cost in the project brochure, and choose with both numbers in hand.
- Plan for key collection. New flats have a 1-year Defects Liability Period from key collection; HDB asks owners to report defects within 1 month and before renovation starts (HDB). Bathroom and toilet wall and floor finishes in new flats cannot be removed for 3 years (HDB). Our BTO key collection checklist covers the rest.
Still Deciding?
Not ready for a quote, and want to talk through OCS, flat type or the order of works first? Ai-Deal is our own AI assistant for Singapore renovation questions, currently in beta. Ask it at ai-deal.ai. Looking at other estates in this launch? See Bayshore Oasis BTO, or our earlier preview, Geylang BTO November 2026: What's Confirmed, What's Not.
Merpati Meadow FAQ
Is there a 3-room or 5-room flat at Merpati Meadow?
No. HDB lists only 2-room Flexi (Type 1 and Type 2) and 4-room flats for Merpati Meadow (HDB Annex A).
What is the MOP at Merpati Meadow?
Ten years, as a Plus project. On resale after the MOP, owners pay HDB 8% of the higher of the resale price and the valuation (HDB release).
How much is the option fee?
$500 for a 2-room Flexi and $2,000 for a 4-room. It forms part of the downpayment (HDB Annex B).
When will Merpati Meadow be completed?
HDB has not given a date. It gives an estimated wait of 39 months from the median month of flat selection (HDB Annex A).
Prices, schemes and dates are as published by HDB on 4 November 2026 and on our product pages on 12 November 2026. Renovation scope and cost depend on your unit and HDB approval; confirm current figures before you commit.












