Singapore Renovation Mistakes: 66% Homeowners Regret Guide

Singapore Renovation Mistakes
RCS – Renovation Contractor Singapore
HDB Licensed • BCA Registered • bizSAFE Level 3 • PMI Member

The brutal truth about Singapore renovations in 2025: 66% of homeowners experience renovation regrets, and 62% exceed their budgets by an average of 20-30%. These statistics from comprehensive Qanvast surveys of over 600 Singapore homeowners reveal a troubling pattern of inadequate planning, poor contractor selection, and budget overruns affecting thousands annually.

More alarmingly, the Consumers Association of Singapore (CASE) reported that $728,000 in renovation prepayment losses occurred in 2024 alone, with 962 renovation-related complaints filed. These figures underscore the critical importance of proper planning and contractor selection.

This complete guide examines actual renovation costs for HDB flats and private properties, common mistakes causing budget overruns, contractor selection criteria that matter, and proven strategies the satisfied 34% of homeowners used to avoid regrets.

The Real Cost of Singapore Renovations in 2025

Understanding renovation costs requires examining verified data from thousands of completed projects across Singapore. Costs vary significantly based on property type, renovation scope, material selections, and contractor quality.

HDB Renovation Costs (4-Room Flat)

Budget renovation: $30,000-$42,600 ($35-$50 per sqft)
Premium renovation: $37,490-$72,000 ($50-$65 per sqft)
Average renovation: $40,000-$52,000

For comprehensive breakdowns of HDB renovation packages, RCS offers transparent pricing from $5,590 for specific room renovations to complete unit transformations.

Common HDB Renovation Packages

Full house painting: $4,800-$8,500
Kitchen renovation: $6,800-$16,000
2 toilets renovation: $9,800-$18,990
Kitchen + 2 toilets package: $18,390-$25,990
All carpentry work: $20,000-$35,000

According to official HDB guidelines, all renovation work must be performed by licensed contractors registered in the Directory of Renovation Contractors (DRC).

Private Property Renovation Costs

Condo (900-1,200 sqft): $45,000-$78,000
Landed property (2,000+ sqft): $80,000-$150,000
Luxury renovation: $100,000-$200,000+

These costs include materials, labor, project management, permits, and basic warranties. However, customization, premium materials, and design complexity can significantly increase total investment.

Why 62% of Homeowners Exceed Their Budgets

Budget overruns aren't accidents—they result from specific, preventable mistakes. Survey data identifies these primary causes affecting thousands of Singapore homeowners annually.

1. Inadequate Initial Planning (38% of Cases)

Homeowners often begin renovations without finalizing all design decisions. Mid-project changes to layouts, materials, or designs trigger Variation Orders (VOs) that add 15-30% to original quotations. Each VO compounds delays and costs, creating cascading budget impacts.

Real Impact: A $40,000 renovation with three VOs averaging $3,000 each increases total cost to $49,000—a 22.5% overrun. Industry data shows homeowners making mid-project changes spend 25-35% more than those who finalized decisions upfront.

2. No Contingency Buffer (43% of Cases)

The average homeowner allocates zero contingency funds. When unexpected issues emerge—hidden water damage, outdated wiring, structural problems—they're forced to cut corners or take emergency loans.

Industry Best Practice: Allocate 10-20% contingency for HDB renovations and 15-25% for older properties. A $40,000 renovation should have $4,000-$8,000 contingency. This buffer covers unforeseen issues without derailing projects or forcing quality compromises.

3. Choosing Based Solely on Price (31% of Cases)

The cheapest quote often signals corners that will be cut. Contractors quoting 20%+ below market rates typically compensate through material substitutions, hidden charges, or subpar workmanship.

Important Note: Always verify contractor credentials through official HDB and BCA channels rather than selecting based solely on price. Proper licensing and insurance coverage protect your investment far better than marginal cost savings.

4. Hidden Costs Not Discussed Upfront

Common hidden costs affecting Singapore renovations include:

Demolition and disposal fees: $800-$1,500
Electrical rewiring: $1,200-$2,500
Waterproofing: $800-$1,800 per bathroom
Hacking and reconstruction: $15-$25 per sqft
Upgrading existing fixtures: $1,000-$3,000
Additional carpentry: $800-$1,500 per item
HDB permit applications: $20-$50 per permit

According to HDB's official renovation guidelines, permits are mandatory for structural modifications, bathroom renovations in BTO flats within 3 years, and major electrical or plumbing work.

The 66% Renovation Regret Reality

What exactly do Singapore homeowners regret? Detailed surveys identify specific issues affecting thousands annually, with financial and emotional impacts lasting years beyond project completion.

Top 10 Renovation Regrets

  1. Insufficient storage space (43% of respondents) - Poor space planning, inadequate cabinets and shelving creating ongoing frustration

  2. Budget overruns (38%) - Exceeding original budget by 20-30% or more, causing financial stress

  3. Poor contractor communication (34%) - Delayed responses, unclear expectations, unresolved conflicts

  4. Compromised functionality for aesthetics (29%) - Prioritizing looks over practical daily use, reducing livability

  5. Inadequate electrical outlets (27%) - Not planning for modern appliances and devices

  6. Rushed decision-making (26%) - Choosing materials or contractors too quickly without proper evaluation

  7. Quality of workmanship (24%) - Subpar finishing, visible defects, premature wear requiring repairs

  8. Material substitutions (22%) - Receiving different materials than agreed without consent

  9. Timeline delays (21%) - Projects taking 30-50% longer than quoted, causing accommodation stress

  10. Warranty and after-sales issues (18%) - Difficulties getting defects fixed post-completion

Financial Impact of These Regrets

Storage additions post-renovation: $3,000-$8,000
Electrical rewiring additions: $1,200-$2,800
Rectifying poor workmanship: $2,000-$5,000
Waterproofing failures: $5,000-$12,000 to fix
Legal disputes and arbitration: $3,000-$10,000

These remedial costs often exceed the initial savings homeowners thought they achieved by choosing cheaper contractors. The financial burden extends beyond direct costs to include temporary accommodation, storage fees, and lost work productivity.

Singapore Renovation Complaints: What the Data Shows

The Consumers Association of Singapore (CASE) processes renovation-related complaints that reveal systematic patterns in the industry. Understanding these trends helps homeowners avoid becoming statistics.

2024 Complaint Statistics

CASE received 14,236 total complaints in 2024, representing a 2% increase from 2023. Of these, 962 complaints were renovation-related, with contractors ranking among the top five complaint categories.

Prepayment Losses: The renovation sector contributed $728,000 of the $1.93 million total prepayment losses in 2024—representing approximately one-third of all consumer losses. These losses resulted from contractors becoming uncontactable mid-project, leaving homeowners with incomplete renovations and forcing them to hire replacement contractors at additional cost.

Top Complaint Categories (2024 Data)

  1. Workmanship quality issues (32%) - Defective work, poor finishing, visible flaws requiring rectification

  2. Non-completion or abandonment (23%) - Contractors disappearing mid-project with homeowner deposits

  3. Contractual disputes (19%) - Disagreements over scope, pricing, timelines, and responsibilities

  4. Material substitutions (14%) - Using different materials without consent or notification

  5. Payment disputes (12%) - Contractors demanding additional payments beyond agreed terms

Average Resolution Outcomes

Licensed contractors with proper credentials: 2-4 weeks resolution time, significantly higher success rate
Non-licensed or unverified contractors: 8-16 weeks resolution time, lower success rate
Legal proceedings: 6-18 months, variable outcomes with significant legal costs

Financial Losses from Complaints

Average loss per complaint: $8,000-$12,000
Legal fees for dispute resolution: $3,000-$8,000
Remedial work costs: $5,000-$15,000
Extended accommodation costs: $2,000-$5,000
Total average impact: $18,000-$47,000 per failed renovation

For homeowners experiencing issues, CASE provides complaint submission services and maintains a Company Alert List identifying problematic businesses.

How to Choose the Right Renovation Contractor

Contractor selection directly correlates with renovation satisfaction. Survey data shows 83% of satisfied homeowners met with at least 3 contractors before deciding, compared to only 51% of dissatisfied homeowners.

Essential Contractor Selection Criteria

1. Verify Licensing and Registration

All HDB renovation work must be performed by licensed contractors. Verification through multiple government channels ensures contractor legitimacy and protects homeowners from fraud.

Essential Verification Steps:

For comprehensive information on licensed contractors, this guide to HDB licensed contractors in Singapore provides detailed selection criteria.

2. Review Portfolio and References

Examination Requirements:

  • Examine at least 5-10 completed projects similar to yours

  • Contact previous clients directly (not just reading online reviews)

  • Visit showrooms or actual completed projects when possible

  • Verify project timelines and budget adherence

  • Assess workmanship quality and attention to detail

Experienced contractors willingly provide references and portfolio evidence. Reluctance to share past work signals potential concerns.

3. Evaluate Communication and Professionalism

Assessment Criteria:

  • Response time to initial inquiries (within 24-48 hours)

  • Clarity of explanations and recommendations

  • Willingness to answer detailed questions

  • Professional documentation and proposals

  • Transparency about potential challenges

Poor communication during consultation predicts ongoing communication issues during renovation. Contractors who provide vague answers or avoid direct questions warrant careful consideration.

4. Detailed Quotation Analysis

Comprehensive quotations include:

  • Itemized breakdown of all materials with specific brands and models

  • Separate labor costs for each trade (carpentry, electrical, plumbing, tiling)

  • Detailed timeline with specific milestone dates

  • Payment schedule tied to verifiable completion stages

  • Warranty terms for both materials and workmanship

  • Clear procedures for handling variation orders

  • Breakdown of permit costs and management fees

Generic quotations with lump-sum pricing hide potential issues. Insist on detailed breakdowns before making decisions.

5. Contract Must-Haves

Essential Contract Components:

  • Complete scope of work documented in writing with specifications

  • Exact material specifications (no generic "similar grade" descriptions)

  • Clear payment terms (progressive payments, never 100% upfront)

  • Defect rectification period (minimum 2-4 weeks post-completion)

  • Warranty coverage (minimum 12 months for workmanship)

  • Dispute resolution procedures and arbitration clauses

  • Contractor licensing and insurance details

Red Flags That Predict Problems

These warning signs have 85%+ correlation with project issues based on complaint analysis:

During Selection:

  • Quotes 20%+ below market rates without clear explanation

  • Pressure to sign contract immediately or "special discount expires today"

  • Requests 30%+ upfront payment before starting any work

  • No detailed written contract, relying on verbal agreements

  • Generic quotations without material brand specifications

  • Cannot provide HDB license or BCA registration documentation

  • No physical office address or showroom location

  • Exclusively positive online reviews (potential fake reviews)

  • Unwilling to provide verifiable references or portfolio

  • Vague answers about timelines, processes, and potential challenges

  • Not listed on official HDB or BCA directories

  • Appears on CASE's Company Alert List

During Renovation:

  • Poor communication and delayed response to inquiries

  • Material substitutions without prior consultation or approval

  • Demanding payment before agreed milestones are completed

  • Inconsistent workmanship quality across different areas

  • Frequent unexplained absences from worksite

  • Resistance to addressing homeowner concerns

Recognizing these red flags early prevents costly mistakes. Homeowners observing multiple warning signs should reconsider contractor selection or seek independent professional advice.

The Complete Renovation Process Timeline

Understanding realistic timelines prevents one of the top 10 regrets—timeline delays affecting 21% of homeowners. Proper planning ensures smooth execution without unnecessary stress.

Planning Phase (4-6 weeks before work starts)

Week 1-2: Research and Budget Setting

  • Define renovation goals and must-have features

  • Set realistic budget with 15-20% contingency

  • Research contractors and read verified reviews

  • Understand HDB or condo renovation regulations

  • Create preliminary design concepts

Week 3-4: Contractor Meetings and Quotations

  • Meet at least 3 licensed contractors for site visits

  • Request detailed itemized quotations from each

  • Verify licensing through official HDB and BCA channels

  • Compare proposals beyond just bottom-line pricing

  • Check contractor insurance coverage

Week 5: Contractor Selection and Contract

  • Finalize contractor selection based on comprehensive evaluation

  • Review contract terms thoroughly before signing

  • Clarify payment schedule and warranty terms

  • Understand variation order procedures

  • Confirm project timeline and milestone dates

Week 6: Material Selection and Permits

  • Finalize all material selections with specific brands

  • Make decisions on colors, finishes, and fixtures

  • Plan electrical outlet locations comprehensively

  • Submit HDB renovation permit applications

  • Coordinate with building management for access

Execution Phase Timelines

Quick Updates (1-3 weeks)

Painting only: 3-5 days for average HDB flat
Kitchen cabinets replacement: 1-2 weeks
Single toilet renovation: 2-3 weeks

Medium Projects (4-6 weeks)

Kitchen + 2 toilets package: 4-5 weeks
Carpentry + painting combination: 4-5 weeks
Partial renovation (living room + bedrooms): 5-6 weeks

Comprehensive Projects (6-12 weeks)

4-Room HDB resale complete renovation: 6-10 weeks
5-Room whole house transformation: 8-12 weeks
Condo full renovation: 8-14 weeks
Landed property complete works: 12-16 weeks

These timelines assume no major permit delays, material supply issues, or significant design changes. Mid-project modifications add 1-3 weeks per major variation order.

What Satisfied Homeowners Did Differently

The 34% of completely satisfied homeowners followed distinct practices that predicted success. Understanding these patterns helps replicate positive outcomes.

Research and Planning Practices

Time Investment:

  • Spent 3-4 weeks researching (vs. 1-2 weeks for dissatisfied homeowners)

  • Met with 4-5 contractors (vs. 2-3 average)

  • Visited at least 2-3 completed projects before deciding

  • Consulted friends and family who recently renovated

Financial Planning:

  • Added 15-20% contingency funds (vs. 0-10% for those with overruns)

  • Created detailed budget spreadsheets tracking all costs

  • Reviewed quotations line-by-line with contractors

  • Understood all potential additional costs upfront

Decision-Making Approaches

Material Selection:

  • Finalized all material selections before signing contracts

  • Created visual references (photos, samples) for every design element

  • Made decisions based on functionality first, aesthetics second

  • Avoided mid-project changes except for genuine unforeseen issues

Contractor Engagement:

  • Verified licensing through multiple official channels

  • Insisted on detailed written contracts with specifications

  • Used progressive payment structures (never large upfront payments)

  • Scheduled weekly check-ins minimum throughout projects

  • Maintained professional but friendly relationships with contractors

Quality Control Measures

During Renovation:

  • Conducted weekly site inspections at minimum

  • Photographed work progress at each milestone

  • Flagged concerns immediately rather than waiting

  • Tested installations (electrical outlets, water flow) at key stages

  • Maintained detailed documentation of all communications

At Completion:

  • Created comprehensive snag lists during final inspection

  • Withheld final payment until all issues resolved satisfactorily

  • Documented all warranties and after-sales contact information

  • Tested all systems thoroughly before contractor departure

These practices don't guarantee perfection, but they significantly reduce risks and improve outcomes. Satisfied homeowners invested more time upfront but experienced fewer problems and better results.

Renovation Success Checklist

Week 1-2: Research Phase

☐ Define must-haves vs. nice-to-haves for renovation
☐ Set realistic budget with 15-20% contingency allocation
☐ Research licensed contractors through official channels
☐ Read verified reviews and complaint records
☐ Understand HDB or condo specific regulations

Week 3-4: Selection Phase

☐ Meet at least 3 licensed contractors for site assessments
☐ Request detailed itemized quotations with specifications
☐ Verify licensing on HDB DRC and BCA Directory
☐ Confirm contractor has proper insurance coverage
☐ Compare proposals comprehensively, not just pricing
☐ Contact previous customers for references

Week 5-6: Planning Phase

☐ Finalize all design decisions before contract signing
☐ Select all materials with specific brand and model numbers
☐ Plan electrical outlets comprehensively for all spaces
☐ Document everything in written contract with specifications
☐ Clarify variation order procedures and pricing
☐ Submit required HDB renovation permits

Week 7+: Execution Phase

☐ Use progressive payment structure tied to milestones
☐ Conduct weekly site inspections minimum
☐ Document work progress with photographs
☐ Flag concerns immediately to contractor
☐ Test installations at each completion milestone
☐ Maintain written communication records

Final Week: Completion Phase

☐ Create comprehensive snag list during inspection
☐ Withhold retention payment until issues resolved
☐ Test all systems (electrical, plumbing, fixtures) thoroughly
☐ Document all warranties with contact information
☐ Obtain care and maintenance instructions
☐ Schedule follow-up inspection after 2-4 weeks

Frequently Asked Questions About Singapore Renovations

What percentage of Singapore homeowners experience renovation regrets?

According to comprehensive Qanvast surveys of over 600 Singapore homeowners, 66% experienced some form of renovation regret. Furthermore, 62% exceeded their original renovation budget, typically by 20-30% or more. The primary causes include inadequate planning, poor contractor selection, and insufficient contingency budgets.

CASE data from 2024 shows 962 renovation complaints with $728,000 in prepayment losses, demonstrating the widespread nature of renovation challenges in Singapore.

How much contingency budget should I allocate for HDB renovation?

Industry experts and experienced contractors recommend allocating 10-20% contingency funds for HDB renovations. For older resale flats (15+ years), increase contingency to 15-25% due to higher risk of hidden issues.

Example: If your planned renovation costs $40,000, budget $46,000-$48,000 total ($40,000 + $6,000-$8,000 contingency). This buffer covers unexpected issues like hidden water damage, outdated wiring requiring replacement, or structural problems commonly found in resale flats.

How long does a typical 4-room HDB renovation take in Singapore?

A typical 4-room HDB resale flat complete renovation takes 6-10 weeks depending on scope and complexity.

Breakdown by Scope:

  • Quick updates (kitchen cabinets only): 1-2 weeks

  • Kitchen + 2 toilets package: 4-5 weeks

  • Partial renovation (carpentry + painting): 4-5 weeks

  • Complete whole-house transformation: 6-10 weeks

For comprehensive renovations including hacking, electrical rewiring, and extensive carpentry, allocate 8-12 weeks. These timelines assume no major permit delays or significant design changes during execution.

What permits are required for HDB renovation in Singapore?

According to official HDB guidelines, renovation permits are mandatory for:

Structural modifications involving walls, columns, or beams
Bathroom tile replacement in BTO flats within 3 years
Window and door changes or modifications
Major electrical or plumbing work
Installation of false ceilings or major carpentry work

Required permits cost $20-$50 per application and take 1-2 weeks to process. All applications are processed through MyNiceHome portal.

Important: Illegal renovations result in fines up to $5,000 plus forced restoration costs. Always engage licensed contractors from HDB's Directory of Renovation Contractors who handle permit applications.

What is the average cost of 4-room HDB renovation in Singapore 2025?

The average cost for 4-room HDB renovation in Singapore ranges from $30,000 to $72,000 depending on renovation scope and material quality.

Cost Breakdown:

  • Budget renovations: $30,000-$42,600 ($35-$50 per sqft)

  • Premium renovations: $37,490-$72,000 ($50-$65 per sqft)

  • Kitchen + 2 toilets packages: $18,390-$25,990

  • Full house painting: $4,800-$8,500

  • All carpentry work: $20,000-$35,000

These costs include carpentry work, electrical and plumbing installations, tiling, painting, and finishing. Additional costs for premium materials, extensive customization, or structural modifications increase total investment.

How do I avoid renovation budget overruns in Singapore?

To avoid budget overruns affecting 62% of homeowners:

Planning Strategies:

  • Finalize all design decisions before signing contracts

  • Allocate 15-20% contingency funds for unexpected issues

  • Obtain detailed itemized quotations with specifications

  • Avoid mid-project changes that trigger Variation Orders

Contractor Selection:

  • Meet at least 3 licensed contractors for comparisons

  • Verify licensing through official HDB and BCA directories

  • Choose contractors with proven track records and proper insurance

  • Don't select based solely on lowest price

Financial Management:

  • Use progressive payment structures (never 100% upfront)

  • Withhold 10-20% retention until completion

  • Document all variations in writing with pricing

  • Review invoices carefully before payments

Should I hire an interior designer or contractor for HDB renovation?

The decision depends on your renovation complexity, design expertise, and budget. Survey data shows 83% of satisfied homeowners meet with at least 3 professionals before deciding.

Interior Designers Are Better If:

  • You need comprehensive space planning expertise

  • Your renovation involves complex layout changes

  • You want professional design guidance throughout

  • You have budget for 10-15% design fees

  • You lack experience making design decisions

Licensed Contractors Are Better If:

  • You have clear design vision and specific requirements

  • Your renovation is straightforward (kitchen, bathrooms)

  • You want to maximize budget for execution

  • You're comfortable making design decisions independently

  • You prioritize cost efficiency

Many homeowners successfully use licensed contractors with design support for optimal value. Contractors like RCS provide free design consultation, 3D visualization, and comprehensive renovation packages from $5,590.

What payment schedule should I use for renovation contractors?

Industry best practice recommends progressive payment structure:

10-15% upon contract signing (covers mobilization and planning)
30-40% at materials delivery and demolition completion
30-40% at substantial completion of major works
10-20% retention withheld for defect rectification period (2-4 weeks)

Never pay 100% before project completion. Contractors demanding excessive upfront payments (30%+) before starting work present significant risk.

Reputable contractors follow standardized payment terms that protect homeowners from prepayment risks. This structure aligns contractor incentives with quality completion.

How can I verify if a renovation contractor is licensed in Singapore?

Verify contractor licensing through multiple official channels:

For HDB Projects:

For Private Properties:

Additional Verification:

  • Review CASE's Company Alert List for complaint history

  • Request contractor's business registration documentation

  • Confirm contractor has proper liability insurance coverage

  • Ask for proof of insurance certificates

Licensed contractors willingly provide credentials and registration numbers. Reluctance to share licensing information is a critical red flag.

Conclusion: Avoiding the Renovation Regret Statistic

The data is unequivocally clear: 66% of Singapore homeowners experience renovation regrets, with 62% exceeding budgets and $728,000 in prepayment losses in 2024 alone. However, this doesn't have to be your story.

The satisfied 34% of homeowners shared common practices: thorough research averaging 3-4 weeks, meeting 4-5 contractors before deciding, comprehensive planning with finalized decisions, 15-20% contingency budgets, and selecting properly licensed and insured contractors.

Key Takeaway: Prevention costs far less than rectification. A $3,000 investment in professional waterproofing prevents $10,000+ in leak damage. Similarly, choosing licensed contractors with proven track records over the cheapest quote protects your investment and ensures accountability throughout your renovation journey.

Protect Your Renovation Investment

Essential Actions:

  • Verify contractor licensing through official HDB and BCA directories

  • Confirm contractor has proper insurance coverage

  • Check CASE's Company Alert List before engaging any contractor

  • Allocate 15-20% contingency funds for unforeseen issues

  • Use progressive payment structures protecting your interests

At RCS Renovation Contractor Singapore, we've helped hundreds of homeowners avoid these pitfalls through transparent pricing, comprehensive warranties, and HDB licensed professionalism. Our renovation packages start from $5,590 for essential renovations to complete transformations, with every detail documented and guaranteed.

Don't become another renovation regret statistic. Contact RCS today for a free consultation and detailed quotation tailored to your needs.


Contact RCS Renovation Contractor Singapore

📞 Phone: +65 8784 8742

✉️ Email: rcs@renovationcontractorsingapore.com

📍 Address: 31 Woodlands Close #03-06, Woodlands Horizon, Singapore 737855

🕒 Operating Hours: Monday-Saturday, 9:00 AM - 6:00 PM

🌐 Website: renovationcontractorsingapore.com

Get your free consultation today and receive a detailed quotation with no hidden charges. Our HDB licensed team ensures complete satisfaction with comprehensive warranties on all work.

Updated on  
Contact RCS Team
RCS – Renovation Contractor Singapore
HDB Licensed • BCA Registered • bizSAFE Level 3 • PMI Member

What Our Customers Say

"

We renovated Malek's parents 4rm resale. They were a referral from another woodlands client. We are stoked to have over delivered on the timeline given.

Click for more
"

Angie contacted us through google last year in 2024. Although only decided to proceed in early 2025. We were definitely not the lowest quote, but she trusted us to know that we don't use underhand tactics to add on to the quote later. Her mama was also very happy with us as we managed to deliver their project on time, considering the complexity of it we still managed to complete in just 1mth.

Click for more
"

Enc Mohamad found us on google when he was searching for renovation. He browsed through our website and was interested in one of our whole house renovation package. We arranged for an appointment and discussed his needs further. He was assured that we can deliver the project as to his expectations and we proceeded with the works. We delivered as promised and more. Happy to see him enjoying his space now.

Click for more
"

From the start of our discussion at your Woodlands office (1st wk of April) until today's handover, it has been slightly less than 4 months. (The actual reno work was about 6 wks period). Overall, my family is happy with the entire renovation process. Even though this is a small project, I appreciate the time and effort you and your teams have put into my flat's renovation. Personally I've learned a few reno things from you through our conversations about this small project too. I am glad that i have chosen RCS for my reno. Thank you very much!

Click for more
"

It was a smooth process and great customer service would recommend.

Click for more
"

Great team and wonderful people to be working with . Aidil and Hussin did an outstanding job. No further feedback . Just post more of ur works on social media to reach the masses, cos you guys are great! RCS Team made our renovation process a smooth one. Clear communications back and forth throughout, with beautiful furnishes 👍🏼