Link copied!
HDB renovation packages 2026 price list: empty BTO kitchen with RCS starting prices for kitchen and 2 toilets, 2 toilets and kitchen cabinets

HDB Renovation Packages & Price List Singapore 2026 | RCS

• By SingRank Singapore — min read
Contact Us via WhatsApp

Disclaimer: This article is published by the RCS Team for general informational purposes only and does not constitute professional advice.

Quick answer: RCS HDB renovation packages in 2026 start at S$5,490 for a BTO kitchen cabinet, S$10,290 for two BTO toilets, S$18,390 for a BTO kitchen with both toilets and S$28,990 for a whole older resale flat (a young resale flat from S$22,990). These are the prices on our store on 1 November 2026. Each price links to its product page, where the full scope of works is listed.

A package price only tells you something when you can see what it buys. So this price list puts every RCS package next to the work it covers and the things it leaves out. Start with the table, then read the section for your flat.

Get a Quote →

How Much Does an HDB Renovation Package Cost in 2026?

It depends on three things. First, whether the flat is a new BTO, a young resale (a BTO flat bought on the resale market) or an older resale flat. Second, how many rooms you are redoing. Third, whether the old tiles stay (overlay) or come out (hacking). The table shows the Most Popular tier, the cheaper of the two tiers we sell. Premium tiers cost more, and each product page lists what changes.

Package (Most Popular tier) New BTO Young resale (BTO resale) Older resale
Kitchen cabinet only S$5,490 S$5,590 S$5,590
Kitchen, overlay S$10,990 S$11,290 S$13,390
Kitchen, hacking not sold S$12,290 S$14,390
2 toilets, overlay S$10,290 S$10,390 S$11,690
2 toilets, hacking not sold S$11,290 S$12,290
Kitchen + 2 toilets, overlay S$18,390 S$18,990 S$23,990
Kitchen + 2 toilets, hacking not sold S$19,990 S$24,990

Whole-flat packages are priced by flat size. A 3-room / 4-room / 5-room new BTO starts at S$7,290 / S$7,390 / S$7,490 for a Move-In package and S$12,990 / S$14,990 / S$15,990 for a Bare Unit package with vinyl. A whole older resale flat starts at S$28,990 / S$30,199 / S$31,290. "Not sold" means we do not sell that package for that flat type. New BTO toilet and kitchen packages are overlay only. The overlay or hacking section below explains why for the toilets.

BTO Packages: Official Pricing

A new BTO flat needs no tiles taken out, so where RCS sells the same work for resale flats, the BTO package costs less. All BTO packages are listed in our BTO packages collection.

Kitchen Cabinet Package

Price: S$5,490 (Most Popular) | S$6,090 (Premium) for a BTO flat. For a resale or young resale flat it is S$5,590 and S$6,190.

HDB kitchen with oak laminate top and bottom cabinets, white quartz countertop, built-in hob and cooker hood
Illustration: the BTO kitchen cabinet package covers 10ft of bottom and 10ft of top cabinets with a tier 1 quartz countertop, from S$5,490 (RCS store).

The Most Popular tier covers a 10ft bottom cabinet and a 10ft top cabinet on a new concrete base, a tier 1 quartz countertop, soft-closing hinges, laminate up to S$60 a piece, three soft-closing drawers and a stainless steel dish rack. A Rinnai hood and 2-burner hob, a sink and a sink tap are included free, and we install the sink and tap. Two things to plan for: the scope lists tiles as by owner, so tiles are not part of this price, and the gas connection is not included.

View Package → · Browse Kitchen Packages →

Bathroom Package (2 Toilets)

Price: S$10,290 (Most Popular) | S$10,490 (Premium), overlay, for a new BTO flat.

Both toilets get new floor and wall tiles laid over the old ones. The scope covers up to 250 sqft per toilet, using 300x300 or 300x600 tiles at S$3.00 per sqft or lower. We take out the old sanitary fittings, extend or plug the concealed water points, and install the WC, bidet, basin and tap, rain shower column and mixer, and storage heater. Two WCs, two bidets, two basins with mixer taps, two rain shower columns and a 15L storage heater are supplied free with the package. The overlay scope has no shower kerb or drop kerb.

View Package → · Browse Bathroom Packages →

Kitchen + Bathroom Combo

Price: S$18,390 (Most Popular) | S$18,990 (Premium), overlay, for a new BTO flat.

Bought on their own, the BTO kitchen (S$10,990) and the two toilets (S$10,290) come to S$21,280, so the combo is S$2,890 less. Read the scopes side by side before you count that as a saving. The combo overlays up to 100 sqft of kitchen floor and 150 sqft of kitchen wall. The kitchen-only package covers up to 150 sqft of floor and 250 sqft of wall. If your kitchen is large, ask which one fits. Our kitchen and two toilets package guide compares every tier, and the kitchen + 2 toilets package page walks through the scope.

View Package →

Move-In Package

Price: from S$7,290 (3-room), S$7,390 (4-room), S$7,490 (5-room), Most Popular tier.

Move-In is for a BTO flat that already has its floors. It covers the 10ft kitchen cabinets with quartz countertop, sink and tap, the storage heater installation, the hood point, debris clearing and whole-house painting in Nippon Vinilex (up to 3 colours on the 3-room package). There is no floor screed or flooring in this package.

Bare Unit Package

Price: Vinyl from S$12,990 (3-room), S$14,990 (4-room), S$15,990 (5-room) | Tiles from S$14,990, S$16,990, S$18,990, Most Popular tier.

Bare Unit is for a BTO flat that comes without floors in the living room and bedrooms. The 4-room vinyl package lays floor screed over up to 700 sqft, then 5mm LVT vinyl, and adds the same kitchen cabinets, storage heater installation and whole-house painting as Move-In. The tiles version lays 600x600 floor tiles over the same 700 sqft instead of screed and vinyl.

View Package → · View BTO Packages → · Budget Planning Guide →

Resale Packages: Addressing Hidden Problems

Resale packages cost more because the work starts with taking things out. In an older flat the toilet tiles, the pipes and the waterproofing have been in use for years, so a hacking package removes them and lays new waterproofing before anything new goes in. See all of them in our resale packages collection, and our HDB resale renovation guide covers the planning.

Two Toilets in a Resale Flat

Price: S$11,690 (overlay) | S$12,290 (hacking), Most Popular tier.

Hacked HDB resale toilet with old tiles removed and a grey waterproofing membrane on the floor and lower walls
Illustration: a resale hacking package removes the old toilet tiles and lays a waterproofing membrane before the new tiles go on (RCS store).

The hacking package removes the floor and wall tiles of both toilets together with the sanitary fittings, piping and door. It then lays a waterproofing membrane with non-shrink grout, K11 and a 3-in-1 waterproof screed, and re-runs the cold water piping in stainless steel. It also retiles up to 250 sqft per toilet, forms a drop kerb at the shower area where the layout allows, and fits a standard PD slide-and-swing door. The overlay package keeps the existing tiles and lays new ones on top.

View Overlay Packages → · View Hacking Packages →

Kitchen Renovation (Resale)

Price: S$13,390 (Overlay) | S$14,390 (Hacking), Most Popular tier. Premium: S$13,990 and S$14,990.

The kitchen packages carry the same 10ft top and bottom cabinets and quartz countertop as the BTO ones. In a resale kitchen the price also covers larger tile areas and a white sealer coat on the kitchen ceiling, and in the hacking tier, removing the old tiles first. The product page lists the floor and wall areas for each tier.

View Package → · Read Resale Guide →

Whole House Resale Package

Price: Vinyl tier from S$28,990 (3-room), S$30,199 (4-room), S$31,290 (5-room) | Hacking tier from S$33,990, S$36,990, S$39,990, Most Popular tier. Premium tiers run up to S$41,590 for a 5-room with hacking.

Both tiers hack the kitchen and both toilets, lay a waterproofing membrane in all three wet areas and fit 10ft kitchen cabinets. The difference is the rest of the floor. Take the 4-room: the vinyl tier at S$30,199 keeps the living and bedroom floors and finishes them with vinyl. The hacking tier at S$36,990 also hacks the living, dining and bedroom floor tiles and lays new 600x600 tiles over up to 700 sqft.

For a young resale flat whose surfaces are still sound, the whole-house BTO resale package starts lower: S$22,990 / S$23,990 / S$24,990 for 3, 4 and 5 rooms with vinyl. It overlays the kitchen and toilet tiles instead of hacking them.

View Package → · Compare Packages →

Overlay or Hacking: Which Does Your Flat Need?

Overlay lays new tiles over sound old ones. Hacking removes the old tiles first, which lets the waterproofing and pipes underneath be redone. For a newly built BTO the choice is made for you in the toilets: HDB says that owners cannot remove toilet wall or floor finishes until 3 years have passed, to protect the waterproofing, and suggests overlaying the original tiles instead. Our new-BTO toilet and kitchen packages are overlay only, which fits that rule.

Overlay tiling in an HDB BTO toilet, with new porcelain tiles laid over the original floor and wall tiles
Illustration: overlay lays new tiles on top of the old ones. In a new BTO flat, HDB asks you to wait 3 years before removing toilet wall or floor finishes (MyNiceHome, HDB).

In an older resale flat, choose hacking when you want the waterproofing and piping redone: the resale hacking packages above lay a new membrane before the new tiles go in. If you are unsure, send us photos of the tiles before you choose a package. Removing floor finishes needs an HDB permit, which our Understand Permits → guide explains.

What Is Not Included in a Package Price?

Each product page lists the full scope of works, and anything not on that list is outside the price. These lines from our scopes are the ones buyers most often miss:

  • Tiles are priced at S$3.00 per sqft or lower. Smaller or bigger tile sizes cost extra in labour and material, and tile wastage depends on the tile and layout you choose.

  • Gas connection is not included in the kitchen packages.

  • The kitchen cabinet package lists tiles as by owner, so tiles are not part of its price.

  • Areas are capped: for example up to 250 sqft per toilet, and in the combo up to 100 sqft of kitchen floor.

  • The BTO toilet overlay scope has no shower kerb or drop kerb.

Furniture, appliances other than the free hood and hob, and carpentry beyond the kitchen cabinets are not in the package scopes. Our Explore Design Trends → guide helps if you are planning more than the package.

HDB Rules Every Package Works Within

Four HDB rules shape every renovation, whichever package you pick. All four are on HDB's How to Renovate Your HDB Flat page.

For a fuller walk-through, read our View 2026 Renovation Guide → and our HDB renovation tips.

Which HDB Renovation Package Fits Your Flat?

Choose by the state of your floors and toilets first, then by flat size.

  • New BTO, floors already in: Move-In, from S$7,290.

  • New BTO, no floors: Bare Unit, from S$12,990 with vinyl.

  • Only the kitchen and toilets need work: the combo, from S$18,390 for a BTO.

  • Older resale, toilets and kitchen worn, other floors fine: whole-house resale vinyl tier, from S$28,990.

  • Older resale, every floor needs replacing: whole-house resale hacking tier, from S$33,990.

How Do You Check a Contractor Is HDB-Licensed?

Check that the contractor appears on HDB's Directory of Renovation Contractors before you pay a deposit. RCS holds HDB licence HB-11-5877Z. Our Verify HDB Licensing → guide shows the steps, our Verify Contractors → guide lists the warning signs, and Compare Top Contractors → shows what to compare between quotes.

Get Started

Open the product page for the package that fits your flat and read its scope of works. Then send us your flat type, whether it is BTO or resale, and photos of the kitchen and toilets. We will tell you which package fits and what, if anything, sits outside it.

📱 WhatsApp: +65 8784 8742
✉️ Email: rcs@renovationcontractorsingapore.com
🌐 Website: renovationcontractorsingapore.com
🏢 Office: 31 Woodlands Close #03-06, Singapore 737855

Get a Quote →

FAQs

What is the cheapest HDB renovation package at RCS?

The Kitchen Cabinet BTO package at S$5,490. It covers 10ft top and bottom cabinets with a quartz countertop, a free Rinnai hood and hob, and a sink and tap. For a whole new BTO flat with floors already in, the Move-In package starts at S$7,290 for a 3-room.

How much is a kitchen and 2 toilet renovation package?

For a new BTO flat it starts at S$18,390 with overlay. For a young resale flat it starts at S$18,990 with overlay or S$19,990 with hacking. For an older resale flat it starts at S$23,990 with overlay or S$24,990 with hacking.

Can I hack the toilet tiles in my new BTO flat?

Not in the first 3 years. HDB says owners of a newly built BTO flat cannot remove toilet wall or floor finishes until 3 years have passed, and suggests overlaying the original tiles instead. After 3 years, changing the toilet floor or wall finishes needs an HDB permit.

How long can an HDB renovation take?

HDB says renovation has to be finished within 3 months in a new flat, or 1 month in an existing flat once it approves the works. Plan the package and the start date around that limit.

Do package prices include the gas connection?

No. Our kitchen packages include a free Rinnai hood and 2-burner hob and their installation, but the scope states no gas connection.

Correction, 1 November 2026: an earlier version of this page showed prices and details that did not match the RCS store. It listed the two-toilet package at S$9,990 and S$10,390 (store: S$10,290 and S$10,490), BTO kitchen cabinets from S$5,590 (store: S$5,490), the resale kitchen from S$13,990 with overlay (store: S$13,390), the Bare Unit package at S$14,290 to S$20,690 (store: S$12,990 to S$19,990) and whole-house resale at S$29,890 to S$39,390 (store: S$28,990 to S$41,590). It also said kitchen cabinets were 20 feet (store scope: 10ft top and 10ft bottom) and listed toilet waterproofing steps (a 2-3 layer membrane and a 48-hour ponding test) that are not in the BTO overlay toilet scope. We removed market cost averages, ratings, percentages, a case story, a free-offer value and a warranty length that we could not source. Every price on this page now matches the store on 1 November 2026.

Contact Us