3rm Bare Unit BTO Package - Premium (Tiles)
3rm Bare Unit BTO Package - Premium (Tiles)
Regular price
$16,690.00 SGD
Regular price
Sale price
$16,690.00 SGD
Unit price
per
Professional Services
Project Management
On-Site Supervision
Materials selection and consultation
3D rendering x 1
- 1x revision
Technical drawing
Masonry Works
To supply labor & materials to lay floor tiles at living/dining and bedrooms only - 500 sqft
* FREE skirtings
- c/w 600x600 tiles $3.30/sqft or lower inclusive gst
To supply labor & materials to construct concrete base for kitchen cabinet only - 10 ft
* smaller and bigger tiles size will incur additional labor/material costs
* tiles wastage for above will be dependant on type of tiles and chosen layout
Carpentry Works
To fabricate & install kitchen bottom cabinet only - 10 ft
To fabricate & install kitchen top cabinet only - 10 ft
To supply & install Quartz top tier 1 single profile only - 10 ft
- all carpentry c/w internal color carcass, ABS door trimmings, soft closing hinges/drawer tracks and selected laminate finish of up to $60.00 per pc.
* FREE 3 drawers w/ soft closing runner
* FREE frosted glass with laminate frame for dishrack door
* FREE standard 304 stainless steel dishrack w/ tray
* FREE waterproofing board for kitchen cabinet sink area up to 3ft only
* FREE 304 stainless steel hinges for kitchen cabinet sink area door 4pcs
* FREE BLUM HK for dishrack
Plumbing Works
To supply labor & tools to install sink+tap only - 1 set
To supply labor & tools to install storage heater tank only - 1no
Electrical Works
To supply & install hood point only - 1 no.
* FREE installation of hood and hob
To supply labor & tools to connect storage heater tank point only - 1no.
To supply labor & tools to install ceiling light only - 7 nos.
Painting Works
To supply labor & materials to paint whole house using Nippon Vinilex only
- ceiling Matex white
- up to 3 colors
Misc Works
To supply labor for haulage only
To supply labor & materials to lay paper protection while ongoing works
- as and when needed only
To supply labor & transport to clear all renovation debris only
To supply labor & materials for whole house general cleaning after all works only
- inclusive chemical wash
* FREE hood and 3 burner hob from Rinnai
* FREE sink
* FREE sink tap
* FREE storage heater tank 20L Slimline