Premium
RCS Renovation Package
4rm Bare Unit BTO Package Premium (Vinyl)
Fit out your brand-new 4-room BTO bare unit with RCS's Premium tier package with vinyl flooring, priced from SGD 15,990 with transparent, all-inclusive pricing. It covers a full bare-unit fit-out plus professional project management, on-site supervision, 3D rendering and technical drawing — so there are no hidden costs or surprises. As an HDB licensed and BCA registered renovation contractor in Singapore, RCS helps you renovate stress-free. See the full scope of works below.
Final cost depends on your unit, selections and any works outside this package.
- HDB Licensed
- BCA Registered
- Project Managed
What's Included
Scope of Works
Professional Services
- Project Management
- On-Site Supervision
- Materials selection and consultation
- 3D rendering
- Technical drawing
Masonry Works
- To supply labor & materials to lay floor screed at living/dining and bedrooms only 700sqft
- up to 50mm height only
- To supply labor & materials to construct concrete base for kitchen cabinet only 10ft
Carpentry Works
- To fabricate & install kitchen bottom cabinet only 10ft
- To fabricate & install kitchen top cabinet only 10ft
- To supply & install Quartz countertop tier 1 single profile only 10ft
- all carpentry c/w internal color carcass, ABS door trimmings, soft closing hinges, selected laminate finish of up to $60.00 per pc and 3 drawers for kitchen cabinet 1set
- FREE 3 drawers w/ soft closing runner
- FREE frosted glass with laminate frame for dishrack door
- FREE 304 stainless steel 2tier dishrack w/ tray
- FREE waterproofing board for kitchen cabinet sink area up to 3ft only
- FREE BLUM HK for dishrack
Plumbing Works
- To supply labor & tools to install sink+tap only 1set
- To supply labor & tools to install storage heater tank only 1no.
Electrical Works
- To supply & install hood point only 1no.
- c/w switch
- FREE installation of hood and hob
- no gas connection
- To supply labor & tools to connect storage heater tank point only 1no.
Painting Works
- To supply labor & materials to paint whole house using Nippon Vinilex only
- ceiling Matex white
- up to 4 colors
Vinyl Works
- To supply & install premium LVT 5mm Vinyl flooring click system for living/dining and bedrooms only 700sqft
- up to 700sqft
- FREE vinyl skirtings
Misc Works
- To supply labor for haulage only
- To supply labor & materials to lay floor/wall protection while ongoing works only
- as and when needed only
- To supply labor & transport to clear all renovation debris only
- To supply labor & materials for whole house general cleaning after all works only
- inclusive chemical wash
- FREE hood and 3 burner hob from Rinnai
- FREE sink
- FREE sink tap
- FREE storage heater tank 30L x1no.
HOME RENOVATION LOADING...
Found a Package That Fits? Let's Talk About Your Home.
Loved by Hundreds
"Benjamin contacted us 5 months before his renovation was scheduled, through one of our toilet renovation packages. When he invited us over for further discussion, we learned that he was looking to combine the bath and WC together. As the toilet package was not suitable for this, we gave him an itemised quote instead, and started the works within 2 weeks after all the submissions were approved. Working in a HDB unit in the heart of the CBD has its own challenges, and at the same time gives you a sense of nostalgia, looking at how far we've come."
"Finally! A one star review even when we’ve done no work for Mr Bernard. This is a special one, and deserves a mention. He took the time to write this one review as he was disappointed that we didnt quote him for the project. Even went as far as to mention that wqe had wasted his time, even when we are the one that spent time and fuel to go over to his place while he was at home. Mr Bernard is special, he doesnt like to discuss things on the spot. When there is a question while he was speaking about a particular work. You cannot ask a question. You’re expected to take notes while is speaking or giving a speech, and then ask the question when he finishes 20mins later! The part that i know that there would be a challenge should he award the project to us is the waste sink pipe for kitchen sink and washer. He expected to change the embedded pvc pipe in the concrete, while telling us that its just at the surface and it’s not that hard. Mind you, he’s not planning to hack the floor tiles in the kitchen. Given the circumstances, we feel that it would be best to avoid quoting for the project altogether. "
"Brian had opted to do exposed piping instead of the standard concealed pipes for his 2 toilets. It was not easy to pull off, with occupants living in. And we’re very happy that it was a very positive experience for him. "
"This nice couple consulted with us for a few months before deciding to touch base again. Their main concern was actually the total reno price between the different companies. We were definitely one of the most competitive, with added value. They had some really unique designs, which we explored and was executed flawlessly. Really happy that they were very happy as we not only realised their designs, but also did it within timeline and budget. "
"Our neighbour here in CCK. Did vinyl flooring and some carpentry works for his place. Nice family and a great experience overall working with them."
"We were entrusted in helping them to spruce up their helper’s space with a platform bed cum storage and also planning for more privacy for the area as well."
"Cesar is a referral from a friend. He is interestingly, an inventor. Just like my friend who referred. And he is also a lecturer in one of the Univerties here. Happy to have connected with him and got to learn more about what he does, and how they are contributing positively to the world. "
"Lovely couple! And they were having twins by the time the reno completed. So happy for them!"
"Cik Yati’s daughter, Lynna got a referral from her friend Liza when they wanted to revamp their kitchen. We did some works for Liza’s Auntie & also parents. Happy that we’ve uplifted their trust in contractors after their renovation experience over 10yrs ago. "