3-Room BTO Renovation in Singapore: Costs, Ideas & Packages

3-Room BTO Renovation in Singapore: Costs, Ideas & Packages
RCS – Renovation Contractor Singapore
HDB Licensed • BCA Registered • bizSAFE Level 3 • PMI Member

Bottom Line Up Front: Getting keys to your new 3-room BTO flat marks an exciting milestone. However, transforming blank spaces into your dream home requires smart planning and HDB compliance. Therefore, this comprehensive guide helps you navigate renovation costs, design ideas, and legal requirements for 2025.

Why 3-Room BTOs Need Smart, Compliant Renovations

Space constraints define the biggest challenge in 3-room BTO renovations. Furthermore, these units typically measure 69 square metres, requiring clever design solutions to maximize functionality. Additionally, HDB regulations govern every aspect of renovation work to maintain building safety and structural integrity.

Subsequently, proper planning becomes essential before any work begins. Moreover, engaging HDB-registered contractors ensures compliance with Housing & Development (Renovation Control) Rules 2006. Meanwhile, understanding permit requirements saves time and prevents costly violations that can reach S$5,000 in fines.

2025 Cost Snapshot for 3-Room BTO Renovations

Based on Renovation Contractor Singapore's actual packages, 3-room BTO renovation costs range from S$14,290 to S$16,690 for their complete bare unit packages.

Package Name Exact Price Flooring Type Grade
3rm Bare Unit BTO Package - Standard (Vinyl) S$14,290 Vinyl Standard
3rm Bare Unit BTO Package - Premium (Vinyl) S$14,890 Vinyl Premium
3rm Bare Unit BTO Package - Standard (Tiles) S$15,790 Tiles Standard
3rm Bare Unit BTO Package - Premium (Tiles) S$16,690 Tiles Premium

What RCS Includes (Based on Their Website):

  • HDB Permit Submission: They handle all permit applications
  • Design Consultation and Drawings: Professional design services included
  • Project Coordination and Vendor Scheduling: Complete project management
  • Site Cleanup and Handover: Professional completion service
  • Comprehensive Renovation: Kitchen and bathroom upgrades for 3-room HDB units
  • Complete Coverage: Walls and flooring, electrical works, and professional wall tiles installation

According to their FAQ, RCS offers "comprehensive renovation packages including kitchen and bathroom upgrades" and "each package includes walls and flooring, electrical works, and professional wall tiles installation." All packages come with design consultation services tailored to meet your specific requirements.

Therefore, allocate an additional 10-15% contingency for unexpected expenses. Also, material costs continue rising due to inflation, making early planning crucial for budget control.


What RCS Customers Actually Say (Real Reviews)

🌟 Mr. Luk - 3RM BTO, Tengah Garden Avenue

"Aidil and Hussin were professional, responsive, and generous with their advice throughout the renovation. They provided excellent customer service and kept us updated with clear communication using WhatsApp and video, which made the process smooth and organised. The workmanship exceeded expectations. Even my wife, who is hard to impress, was genuinely pleased. While I exceeded my budget, it was only because I added more carpentry. It was a pleasure seeing our home come to life, and I highly recommend RCS to anyone planning a renovation."

🌟 Angie - 5 Room BTO Pasir Ris

"RCS stood out with their clear and comprehensive quotation that covered everything upfront, giving us full confidence from the start. Despite exploring multiple options, we chose RCS for their transparency and professionalism. Throughout the renovation, Aidil provided daily updates that kept us fully assured even without onsite checks. Everything was completed on time and to our satisfaction. We are very happy with the results, and Aidil and his team truly delivered a fabulous job."

Why Customers Choose RCS:

Based on their website information:

  • Comprehensive Warranties: Complete peace of mind through professional workmanship
  • HDB Authority Coordination: They handle all permit applications seamlessly
  • Safety Standards: Experienced team ensures all electrical works meet Singapore safety standards
  • Premium Materials: Use premium materials for walls and flooring that last for decades
  • Space Planning Expertise: Specialists in maximizing 3-room HDB layouts efficiently

RCS 3-Room BTO Renovation Packages (What You Get)

3rm Bare Unit BTO Package - Standard (Vinyl) – S$14,290

This comprehensive renovation package covers everything from basic BTO renovation with vinyl flooring. According to RCS, their packages include kitchen and bathroom upgrades, walls and flooring, electrical works, and professional design consultation services.

What RCS States is Included:

  • Kitchen and bathroom upgrades for 3-room HDB units
  • Walls and flooring installation
  • Electrical works (meeting Singapore safety standards)
  • Design consultation services tailored to your requirements
  • HDB permit submission handled
  • Project coordination and vendor scheduling
  • Site cleanup and handover

View Standard Vinyl Package

3rm Bare Unit BTO Package - Premium (Vinyl) – S$14,890

The premium vinyl option provides enhanced features while maintaining vinyl flooring. RCS describes this as part of their luxury interior design solutions with the same comprehensive coverage.

Includes All Standard Features Plus Premium Grade:

  • Premium-grade vinyl flooring installation
  • Enhanced kitchen and bathroom upgrades
  • All electrical works and safety compliance
  • Professional design consultation services
  • Complete project management and coordination

Choose Premium Vinyl

3rm Bare Unit BTO Package - Standard (Tiles) – S$15,790

Features professional wall tiles installation as highlighted in RCS's FAQ section. They emphasize using premium materials for walls and flooring that last for decades.

Tile Package Benefits:

  • Professional wall tiles installation
  • Premium materials for walls and flooring (decades durability)
  • Complete kitchen and bathroom renovation
  • All electrical works and HDB compliance
  • Full design consultation and project management

Select Standard Tiles

3rm Bare Unit BTO Package - Premium (Tiles) – S$16,690

The highest-tier package combining premium tiles with luxury interior design solutions. RCS specializes in maximizing 3-room HDB layouts efficiently with optimized designs.

Premium Tile Package:

  • Premium-grade professional wall tiles installation
  • Luxury interior design solutions
  • Space planning expertise for maximum efficiency
  • Premium materials throughout (walls and flooring)
  • Comprehensive project coordination
  • Professional workmanship with warranties

Choose Premium Tiles


Space-Saving Design for 3-Room BTOs (Room-by-Room)

Kitchen: Maximizing Cooking Efficiency

Galley kitchens work exceptionally well in 3-room BTOs due to efficient workflow patterns. Alternatively, L-shaped configurations suit units with wider kitchen areas. Furthermore, tall pantry cabinets utilize vertical space effectively, while integrated appliances maintain clean sight lines.

Smart Kitchen Solutions:

  • Pull-out drawers instead of deep cabinets
  • Wall-mounted storage systems
  • Compact integrated appliances
  • Multi-level counter surfaces
  • Hidden storage compartments

Living/Dining: Creating Open Flow

Built-in bench seating doubles as storage while accommodating guests efficiently. Meanwhile, fold-away dining tables expand when needed but save space daily. Additionally, maintaining clear corridor sight lines creates illusions of larger space.

Living Area Optimization:

  • Modular furniture systems
  • Wall-mounted TV console
  • Under-stair storage utilization
  • Multi-functional coffee tables
  • Strategic mirror placement

Master + Common Room: Smart Storage Planning

Wardrobe planning requires careful measurement and smart organization systems. Subsequently, under-bed storage maximizes floor space, while Murphy beds or sofa-beds accommodate overnight guests without permanent space loss.

Bedroom Storage Strategies:

  • Floor-to-ceiling wardrobes
  • Built-in study desk solutions
  • Overhead storage compartments
  • Sliding door systems
  • Multi-functional furniture pieces

Storage & Carpentry Tips: Budget-Smart Decisions

Linear metre (LM) calculations help control carpentry costs effectively. Moreover, modular systems often provide better value than fully bespoke solutions. Therefore, prioritize essential storage needs over aesthetic preferences when budget constraints exist.

HDB Rules You Must Know (No Headaches Later)

Understanding HDB regulations prevents costly mistakes and project delays. Specifically, certain renovation works require permits from HDB before commencement, while others have strict limitations to protect building integrity.

Permit Requirements Include:

  • Wall demolition or construction
  • Floor finish replacement
  • Electrical work beyond basic repairs
  • Air-conditioning installation
  • Major plumbing modifications

Critical BTO Restrictions:

3-Year Bathroom Wet Works Restriction: Newly completed BTOs have a 3-year restriction on bathroom wet works to protect waterproofing. However, overlay methods allow bathroom upgrades during this period without compromising structural protection.

Working Hours Compliance:

  • Monday to Saturday: 9am to 6pm only
  • No noisy work after 5pm weekdays
  • Complete prohibition on weekends and holidays
  • Maximum 3 consecutive days for noisy work

For detailed guidance, reference our HDB Renovation Permit 2025 Guide.

Timeline Expectations:

  • Kitchen renovation: 2-4 weeks
  • Bathroom overlay: 1-2 weeks
  • Tiling work: 1-2 weeks
  • Carpentry installation: 3-5 weeks
  • Overall project: 8-12 weeks

Timeline & Milestones (From Keys to Handover)

Pre-Construction Phase (Weeks 1-2):

Initial design consultation and space planning occur first. Subsequently, permit applications and material selection require careful coordination. Meanwhile, fabrication of custom carpentry begins off-site to minimize installation time.

Construction Phase (Weeks 3-8):

Hacking and preparation work start the physical renovation process. Furthermore, electrical and plumbing rough-in happens before any finishing work. Additionally, carpentry installation and painting proceed simultaneously for efficiency.

Finishing Phase (Weeks 9-10):

Final installations, including fixtures and appliances, complete the transformation. Moreover, detailed cleaning and quality assurance checks ensure everything meets standards. Subsequently, defect identification and rectification occur before handover.

Buffer Planning:

Always include 2-3 weeks buffer for permit approvals and potential delays. Also, material delivery schedules can impact timelines, especially during peak renovation seasons.

Transparent Pricing & Quotations

RCS provides line-item quotations with detailed material specifications and warranty terms. Furthermore, our pricing structure eliminates hidden costs through comprehensive project scoping. Additionally, after-sales support ensures long-term satisfaction with your investment.

Quotation Components:

  • Detailed scope of work descriptions
  • Material brand and grade specifications
  • Labour cost breakdowns
  • Project timeline commitments
  • Warranty coverage details

Comparison Tips:

Always compare like-for-like specifications across different contractors. Moreover, verify contractor registration with HDB's Directory of Renovation Contractors. Subsequently, check insurance coverage and past project references for quality assurance.

Case Snippets (Before/After Highlights)

Project Alpha - Bedok BTO (S$45,000):

Young couple transformed their unit with Scandinavian-inspired design. Specifically, they chose light wood carpentry with white quartz countertops for timeless appeal. Furthermore, clever storage solutions maximized space without compromising aesthetics.

Project Beta - Punggol BTO (S$52,000):

Growing family prioritized functionality with premium finishes. Additionally, they included smart home features and expanded storage throughout. Moreover, their investment focused on long-term value and adaptability.

Project Gamma - Tampines BTO (S$38,000):

Budget-conscious homeowners achieved beautiful results through strategic material choices. Consequently, they maximized impact while maintaining cost control through careful planning.

Why Choose an HDB-Registered Contractor (RCS)

HDB registration ensures compliance with safety standards and building regulations. Furthermore, registered contractors carry proper insurance coverage and provide workmanship guarantees. Additionally, documented change orders protect both parties throughout the renovation process.

RCS Advantages:

  • Full HDB compliance and registration
  • Comprehensive insurance coverage
  • 12-month workmanship warranty
  • Transparent project documentation
  • Professional project management

For additional insights, explore our Singapore Renovation Guide 2025.


Frequently Asked Questions (Rich, Concise Answers)

What are RCS's actual 3-room BTO renovation package prices?

RCS offers four fixed-price packages: Standard Vinyl (S$14,290), Premium Vinyl (S$14,890), Standard Tiles (S$15,790), and Premium Tiles (S$16,690). All packages include kitchen and bathroom upgrades, walls and flooring, electrical works, design consultation services, HDB permit submission, project coordination, and site cleanup.

What exactly is included in RCS renovation packages?

According to their website, RCS packages include "kitchen and bathroom upgrades for 3-room HDB units," "walls and flooring, electrical works, and professional wall tiles installation," plus "design consultation services tailored to meet your specific requirements." They also handle HDB permit submission, project coordination and vendor scheduling, and site cleanup and handover.

How does RCS ensure quality and peace of mind?

RCS states they provide "complete peace of mind through comprehensive warranties and professional workmanship." They handle all permit applications and coordinate with HDB authorities seamlessly. Their experienced team ensures all electrical works meet Singapore safety standards, and they use premium materials for walls and flooring that last for decades.

Can RCS customize the space planning for my 3-room HDB?

Yes, according to their FAQ: "Our space planning experts specialize in maximizing 3-room HDB layouts efficiently. We conduct detailed design consultation sessions to understand your needs. First, we assess your current kitchen and bathroom configuration thoroughly. Then, our interior design team creates optimized layouts tailored to meet your family's lifestyle requirements."

What makes RCS different from other renovation contractors?

Based on customer testimonials, RCS stands out for "clear and comprehensive quotation that covered everything upfront," transparency and professionalism, daily updates during renovation, and completing projects on time. They provide professional communication via WhatsApp and video updates throughout the process.

How long does a 3-room BTO renovation take in Singapore?

Typical BTO renovations require 8-10 weeks for completion. Timeline varies based on scope complexity and permit approval durations. Kitchen renovation takes 2-4 weeks, bathroom overlay 1-2 weeks, and carpentry installation 3-5 weeks. Furthermore, peak renovation seasons may extend schedules due to contractor availability.

Can I renovate the bathroom within 3 years of key collection?

HDB restricts wet works in BTO bathrooms for 3 years to protect waterproofing. However, overlay methods allow fixture upgrades and aesthetic improvements without compromising structural protection. Therefore, you can install new toilets, basins, and tiles over existing surfaces. Full renovation becomes possible after the restriction period ends.

Is hacking allowed in 3-room BTOs?

Yes, but permits are required for wall demolition or construction work. Additionally, structural walls cannot be removed under any circumstances. Consequently, engage HDB-registered contractors for proper assessment and permit applications. Meanwhile, minor modifications like creating arches require separate approvals.

What renovation permits do I need for my 3-room BTO?

HDB permits are required for wall demolition/construction, floor finish replacement, electrical work beyond basic repairs, air-conditioning installation, and major plumbing modifications. Additionally, only HDB-registered contractors can submit permit applications on your behalf. Permit processing typically takes up to 3 weeks depending on work complexity.

How can I reduce my 3-room BTO renovation costs?

Focus on essential upgrades first, choose mid-range materials over premium options, minimize custom carpentry, and plan renovations during off-peak periods. Additionally, comparing multiple quotations and bundling services with one contractor often reduces overall costs. Furthermore, avoiding last-minute changes prevents additional charges.

🏠 Ready to Renovate Your 3-Room BTO?

Get Your Renovation Started with RCS

RCS offers comprehensive 3-room BTO renovation packages from S$14,290 to S$16,690. Their packages cover everything from basic BTO renovation to luxury interior design solutions.

What You Get:

  • Kitchen and bathroom upgrades for 3-room HDB units
  • Walls and flooring, electrical works, and professional wall tiles installation
  • Design consultation services tailored to your specific requirements
  • HDB permit submission and project coordination
  • Site cleanup and handover

Contact RCS for Your 3-Room BTO Renovation

💬 WhatsApp: +65 8784 8742

📞 Phone: +65 8784 8742

✉️ Email: rcs@renovationcontractorsingapore.com

🏢 Address: 31 Woodlands Close #03-06, Singapore 737855

⏰ Business Hours: Monday - Saturday, 9AM - 6PM

🌐 Website: renovationcontractorsingapore.com

💬 Speak to Their Team

📋 View All Packages

Download our free BTO Renovation Checklist at renovationcontractorsingapore.com to ensure nothing gets overlooked during your planning process.

Summary: RCS 3-Room BTO Renovation Packages 2025

Key Information: RCS offers four comprehensive 3-room BTO renovation packages ranging from S$14,290 to S$16,690, covering everything from basic BTO renovation to luxury interior design solutions.

What's Included in All Packages:

  • Comprehensive Coverage: Kitchen and bathroom upgrades for 3-room HDB units
  • Complete Installation: Walls and flooring, electrical works, and professional wall tiles installation
  • Professional Service: Design consultation services tailored to your specific requirements
  • Project Management: HDB permit submission, project coordination and vendor scheduling
  • Quality Assurance: Premium materials that last for decades, comprehensive warranties
  • Complete Service: Site cleanup and handover included

Contact: WhatsApp +65 8784 8742 or visit renovationcontractorsingapore.com

About the Author: This guide was prepared by Renovation Contractor Singapore (RCS) project managers with over 8 years of experience in HDB renovations. Our team holds current HDB registration and has completed over 3,000 successful BTO transformations across Singapore since 2017. Visit renovationcontractorsingapore.com for more renovation insights.

Company Profile:

  • HDB Licensed Contractor (Directory of Renovation Contractors)
  • 12-month comprehensive warranty on all work
  • Transparent pricing with no hidden costs
  • Professional project management and quality assurance

Sources:

  • Housing & Development Board official guidelines
  • MoneySmart Singapore renovation cost analysis 2025
  • Industry cost data from multiple verified sources

 

Updated on  
Contact RCS Team
RCS – Renovation Contractor Singapore
HDB Licensed • BCA Registered • bizSAFE Level 3 • PMI Member

What Our Customers Say

"

Ms Hung contacted us through our facebook contact form for her renovation. We discussed briefly through whatsapp, quoted her and made a site visit to the unit. After that, we met again at our office to straighten some final details and we commenced with her renovation. She even did blinds and curtains with us.

Click for more
"

We engaged Renovation Contractor Singapore (RCS) to fully renovate our two toilets, and I highly recommend them to anyone looking for reliable and quality renovation services. I'm already looking forward to engaging them again when I get my own flat in the future. This was first renovation experience and doing it for my elderly parents made it even more stressful. However, it turned out to be a smooth and fuss-free process from the start to finish, all thanks to Aidil. He was professional, reassuring, responsive, and incredibly helpful throughout the entire journey. The project was completed well ahead of schedule, with excellent workmanship an no surprise costs - completely different from the horror renovation stories we've all heard. I had approached two other companies for quotes, but Aidil stood out from the beginning. He took the time to understand our needs during the initial meeting and remembered every detail. There was little to no issues during the renovation. Aidil was always quick to step in and resolve anything that came up. His team also showed strong expertise in their respective areas - especially the tiler and painter. It's cleat that Aidil and his team take pride in their work; they don't just aim to complete the job, but to do it with care and high standards.

Click for more
"

Naufal contacted us through our social ads. He was upgrading from a MOP unit to a larger one. It was right smack in the middle of Covid era, and his project was the first one we did after getting permission from BCA to resume work. It was not easy, although we managed to pull it off.

Click for more
"

Mr Patrick, was looking to retire here. He had just spent some time living in Australia, and decided to come back here to rest. He was a pleasant person to work with, and only took under 5mins to decide on his choice of tiles for his kitchen, bathroom and toilet. As always, we completed his renovation way ahead of schedule.

Click for more
"

Thank U so much for the services rendered. We love the wardrobes. I love my room especially. It's so inviting and cozy, for me. The extension of the table serves as the sleeping spots for my fur babies.

Click for more
"

Riduan enquired with us since a year ago, and was looking to let his HIP complete first before deciding to renovate. He was referred to us by one of our friends that we did some works for previously. The project consists pf hacking his whole house flooring, revamp of his kitchen, rewiring, some other minor works and helping him to coordinate the air con installation.

Click for more
×

Your product grid title

Browse All