RCS publishes every package price on the product page. This page lists all 26 of them for 2026 — 16 kitchen packages and 10 two-toilet packages — alongside the payment schedule and the licence details you can verify yourself. Prices are current as at 27 July 2026.
Why a Published Price List Changes How You Compare Quotes
A published price list gives you a fixed reference point. When every contractor quotes verbally, you cannot tell whether a lower number means better value or a shorter scope. When one contractor publishes, you can hold every other quote against it line by line.
That is the whole argument for reading this page before you collect quotes. Compare scope lines, never headline totals.
Kitchen Packages: All 16 Prices
Kitchen work splits into two tiers. Cabinet-only packages replace carcasses, doors and countertop. Full kitchen packages add floor and wall tiling, plumbing and electrical provisions. The gap between the tiers is roughly S$5,500, and it is decided by the condition of your tiles rather than your taste in doors.
Cabinet-only packages
| Package | Price |
|---|---|
| Kitchen Cabinet BTO — Most Popular | S$5,490 |
| Kitchen Cabinet BTO — Premium | S$6,090 |
| Kitchen Cabinet BTO Resale — Most Popular | S$5,590 |
| Kitchen Cabinet BTO Resale — Premium | S$6,190 |
| Kitchen Cabinet Resale — Most Popular | S$5,590 |
| Kitchen Cabinet Resale — Premium | S$6,190 |
Cabinet prices do not move with the age of the flat, because carpentry does not care how old the block is. The only variable is the tier.
Full kitchen packages
| Package | Method | Price |
|---|---|---|
| Kitchen BTO — Most Popular | Overlay | S$10,990 |
| Kitchen BTO — Premium | Overlay | S$11,590 |
| Kitchen BTO Resale — Most Popular | Overlay | S$11,290 |
| Kitchen BTO Resale — Most Popular | Hacking | S$12,290 |
| Kitchen BTO Resale — Premium | Overlay | S$11,890 |
| Kitchen BTO Resale — Premium | Hacking | S$12,890 |
| Kitchen Resale — Most Popular | Overlay | S$13,390 |
| Kitchen Resale — Most Popular | Hacking | S$14,390 |
| Kitchen Resale — Premium | Overlay | S$13,990 |
| Kitchen Resale — Premium | Hacking | S$14,990 |
Across all four matched pairs, hacking costs exactly S$1,000 more than overlay. A consistent gap tells you the premium is removal and disposal labour, not a percentage margin on a bigger job. Full method comparison: Kitchen Overlay vs Hacking Singapore 2026.
Browse the scope on each page: kitchen cabinet packages and full kitchen packages. Deeper cost analysis: Kitchen Renovation Singapore 2026.
Two-Toilet Packages: All 10 Prices
Toilet packages are priced per pair, because most HDB flats have two. The method matters more here than anywhere else in the flat, since hacking is what triggers new waterproofing.
| Package | Method | Price |
|---|---|---|
| 2 Toilets BTO — Most Popular | Overlay | S$10,290 |
| 2 Toilets BTO — Premium | Overlay | S$10,490 |
| 2 Toilets BTO Resale — Most Popular | Overlay | S$10,390 |
| 2 Toilets BTO Resale — Premium | Overlay | S$10,590 |
| 2 Toilets BTO Resale — Most Popular | Hacking | S$11,290 |
| 2 Toilets BTO Resale — Premium | Hacking | S$11,590 |
| 2 Toilets Resale — Most Popular | Overlay | S$11,690 |
| 2 Toilets Resale — Premium | Overlay | S$11,990 |
| 2 Toilets Resale — Most Popular | Hacking | S$12,290 |
| 2 Toilets Resale — Premium | Hacking | S$12,590 |
BTO owners inside the 3-year restriction period take an overlay package, because HDB does not permit removal of bathroom wall and floor finishes in newly built flats (HDB). Resale owners with sound substrate can also overlay. Resale owners with failing tiles need hacking.
Full list with scope: toilet renovation packages. The technical specification behind the hacking tier is covered in Toilet Waterproofing Singapore 2026.
Flat-Level Packages
Beyond kitchen and toilet, RCS lists packages by flat type and condition. Each page carries its own scope and current price.
- 3-Room BTO · 4-Room BTO · 5-Room BTO
- 3-Room Resale · 5-Room Resale
- 3-Room BTO Resale · 5-Room BTO Resale
- Ad-hoc BTO packages · Ad-hoc resale packages
Prices on those pages move with scope, so read the page rather than a summary of it. Whole-flat budgeting sits in HDB Renovation Budget 2026.
What Package Prices Do Not Cover
Every fixed-price package has a boundary, and the boundary is where surprise bills come from. In most Singapore kitchen packages the hob, hood, oven and fridge are homeowner-supplied, along with any carpentry beyond the standard cabinet run.
Budget 10 to 15 per cent beyond the package price for exactly this. On a S$11,290 kitchen that is roughly S$1,100 to S$1,700. Homeowners who budget only the package price are the ones who feel ambushed in week four.
The Payment Schedule
RCS stages payment across the five phases of its process, and a balance stays withheld until handover. The schedule runs: 10 per cent deposit to lock in scope, 40 per cent before pre-work begins, 30 per cent at masonry, 15 per cent at carpentry measurement, and a final 5 per cent at handover.
That final tranche matters more than its size. It is your only leverage on defects, so any schedule that collects the full amount before handover has removed your remedy. Phase detail sits on The RCS Method.
Credentials You Can Verify Yourself
RCS holds HDB Renovation Contractor Licence HB-11-5877Z, is BCA-registered, holds bizSAFE Level 3, and maintains active PMI membership. The company has operated since 2017 across HDB, condominium and landed projects.
Do not take that on trust. Check the licence number in HDB's Directory of Renovation Contractors e-Service. The Housing & Development (Renovation Control) Rules 2006 require that you engage only a listed contractor, and HDB places responsibility for that compliance on you as the flat owner.
Note what listing does and does not mean. HDB lists contractors; it does not certify workmanship. The listing is your legal floor, not a quality guarantee.
Frequently Asked Questions
Are RCS prices fixed or estimates?
The figures on this page are listed package prices from the product pages, not estimates. Scope is defined on each page. Site conditions can add work outside that scope, which is why the 10 to 15 per cent buffer exists.
Do the package prices include GST?
Confirm the GST treatment on the specific product page before signing, since it affects the figure you budget. Ask for it in writing in the quotation alongside the scope lines.
Why does hacking cost S$1,000 more than overlay?
The premium covers tile removal, debris disposal and the extra days of noisy work under HDB's restricted hours. It is a fixed S$1,000 across all four matched package pairs, which shows it is a labour cost rather than a percentage margin.
Can I take a kitchen package without a toilet package?
Yes. Kitchen and toilet packages are priced and sold separately, and each has its own scope page. Many homeowners phase the work, doing the kitchen first and the toilets later.
How much should I hold back until handover?
RCS holds 5 per cent to the final handover. Whatever contractor you engage, keep a final tranche outstanding until you have walked the flat and logged defects. Defects found before payment get fixed; defects found after become a negotiation.
How do I verify an HDB renovation contractor?
Search the exact registered company name in HDB's Directory of Renovation Contractors e-Service, then confirm the licence number matches what the contractor gave you. Also confirm the registered address and phone resolve to real business premises.
Get the Scope in Writing
Every price on this page is on a product page with its scope listed, so you can compare it against any other quote line by line. Bring your flat type, your tile condition and your target budget, and the conversation starts from a number rather than a guess.
Speak to the RCS team on WhatsApp
Disclaimer: prices listed are current as at 27 July 2026 and may change without notice. Renovation scope, permits and costs vary by unit and by HDB approval. Confirm all figures on the product page and in a written quotation before committing.