Kitchen Renovation Packages Singapore: What You Need to Know in 2025 to 2027

Kitchen Renovation Packages Singapore
RCS – Renovation Contractor Singapore
HDB Licensed • BCA Registered • bizSAFE Level 3 • PMI Member

Kitchen Renovation Packages Singapore: What You Need to Know in 2025

Most Singapore homeowners spend $10,000 to $25,000 renovating their kitchens, depending on flat type and scope of work. Package-based pricing eliminates budget surprises by bundling carpentry, countertops, plumbing, and electrical work under one transparent quote.

Package solutions typically complete 3-4 weeks faster than coordinating separate contractors, with BTO cabinet installations finishing in 2-3 weeks and complete resale transformations requiring 5-7 weeks. This guide breaks down real pricing, what's included, and how to choose the right package for your home.

Why Choose Kitchen Renovation Packages?

Package pricing removes the guesswork from budgeting. Instead of receiving attractive base quotes that balloon with "unexpected" charges for debris removal, HDB permits, or site protection, packages include these essentials upfront. You know the total cost before work begins.

Single-point accountability also simplifies project management. One team handles carpentry, masonry, plumbing, and electrical work under a unified schedule with clear completion dates. For first-time renovators unfamiliar with coordinating multiple tradespeople, this integrated approach reduces stress significantly.

Material selection becomes less overwhelming when packages specify curated options within defined quality tiers. Rather than evaluating hundreds of laminate colors independently, you choose from proven combinations that balance aesthetics with durability. Clear upgrade pricing allows customization without project-wide cost escalation.

What's Actually Included in Kitchen Renovation Packages?

Standard packages typically cover these core elements:

Design and Management:

  • Initial consultation with space planning recommendations

  • 2D layout drawings or 3D renderings for visualization

  • Project coordination with regular site supervision

  • Material selection guidance within package tiers

  • HDB permit application and approval follow-up

Carpentry Work:

  • Custom cabinet fabrication based on kitchen measurements

  • Top and bottom cabinet installation (linear footage varies by package)

  • Moisture-resistant construction with soft-closing hinges

  • Laminate finish application in selected colors/textures

  • Standard accessories like dish racks and cutlery trays

Countertops and Surfaces:

  • Professional templating for precise fit

  • Quartz slab cutting and installation (tier selections vary)

  • Backsplash installation and proper sealing

  • Cutouts for sink, cooktop, and drainage

Plumbing and Electrical Connections:

  • Stainless steel or PVC piping installation

  • Kitchen sink mounting with proper drainage

  • Basic appliance power points and hood electrical connection

  • Leak testing before handover

Site Preparation and Cleanup:

  • Flooring protection during construction

  • Material delivery and handling

  • Debris removal and waste disposal

  • Final cleaning upon completion

Typically NOT Included:
Appliances (hood, hob, oven), though installation labor is covered. Kitchen sinks and taps are usually owner-supplied items. Extensive electrical rewiring beyond basic connections requires separate quotation. Always request detailed documentation listing every inclusion and exclusion before signing contracts.

Kitchen Renovation Package Pricing: BTO vs Resale

Real pricing varies significantly based on flat type, renovation scope, and material selections:

BTO Kitchen Cabinet Packages

4-Room Kitchen Cabinet BTO Package - Standard: $5,590

Perfect for new BTO owners, this package includes:

  • 10 feet kitchen bottom cabinet with soft-closing hinges

  • 10 feet kitchen top cabinet with internal white carcass

  • Quartz Tier 1 countertop with professional installation

  • Premium laminate finish with moisture-resistant construction

  • Complete project management and 3D design rendering

4-Room Kitchen Cabinet BTO Package - Premium: $6,190

Enhanced version with $600 in upgrades:

  • Color carcass options beyond standard white

  • Premium laminate selections up to $60 per piece

  • Upgraded soft-closing mechanisms for extended durability

  • Enhanced hardware and additional electrical points

Untuk panduan lengkap renovasi BTO, baca artikel HDB BTO Renovation Budget Singapore 2025: Expert Guide yang mencakup perencanaan budget untuk semua tipe ruangan.

Complete BTO Kitchen Packages

4-Room Kitchen BTO Package - Standard (Overlay): $11,290

Comprehensive solution for complete BTO kitchen setup:

  • All cabinet package features (10 feet coverage)

  • Professional plumbing installation

  • Electrical connections for all appliances

  • Site protection and complete cleanup

  • HDB permit application handling

4-Room Kitchen BTO Package - Premium (Overlay): $11,790

Premium materials and extended features for $500 more:

  • Enhanced laminate and hardware selections

  • Additional storage accessories

  • Extended electrical connection points

  • Priority project scheduling

Resale Kitchen Renovation Packages

4-Room Kitchen Cabinet Resale Package - Standard: $5,590

Cabinet-only solution for structurally sound kitchens:

  • Custom cabinet fabrication and installation

  • Moisture-resistant plywood construction

  • Soft-closing hinges and drawer runners

  • Quartz Tier 1 countertop

  • Professional design consultation

4-Room Kitchen Cabinet Resale Package - Premium: $6,190

Enhanced materials and expanded options matching BTO premium features with color carcass, premium laminate access, and upgraded hardware systems.

Complete Resale Kitchen Transformations

4-Room Kitchen Resale Package - Standard (Overlay): $13,990

The most popular choice for resale HDB makeovers:

  • Complete cabinet replacement with overlay method

  • 20 feet combined top and bottom coverage

  • Quartz countertop with backsplash

  • Full plumbing and electrical installation

  • Professional project management and permits

4-Room Kitchen Resale Package - Standard (Hacking): $14,390

Complete transformation including demolition work:

  • Full hacking of existing floors and walls

  • Complete cabinet and fixture removal

  • New kitchen base construction with waterproofing

  • Cement screeding and professional tiling

  • All standard overlay package features

4-Room Kitchen Resale Package - Premium (Overlay): $14,590

Enhanced materials for $600 premium:

  • 22-24 feet total cabinet coverage

  • Quartz Tier 2 countertops with distinctive patterns

  • Blum/Hettich branded soft-closing systems

  • Additional design features and storage solutions

4-Room Kitchen Resale Package - Premium (Hacking): $14,990

Most comprehensive transformation combining full hacking with premium materials and extended coverage for complete kitchen reimagining.

Untuk tips memilih material cabinet berkualitas, lihat panduan Make Your HDB Kitchen Great: Easy Tips for Better Cabinets yang menjelaskan perbedaan konstruksi antara budget dan premium options.

Combined Kitchen and Toilet Packages

4-Room Kitchen + 2 Toilets BTO Package - Standard (Overlay): $18,390

Maximum value bundling kitchen and bathroom renovations:

  • Complete kitchen works from standard package

  • Two full toilet renovations included

  • Unified project timeline (6-8 weeks)

  • Approximately 15-20% savings versus separate projects

4-Room Kitchen + 2 Toilets BTO Package - Premium (Overlay): $18,990

Enhanced materials across all wet areas with premium finishes, extended coverage, and upgraded fixtures for $600 additional investment.

4-Room Kitchen + 2 Toilets Resale Package - Standard (Overlay): $24,490

Complete wet area transformation for resale flats:

  • Overlay kitchen renovation with 20 feet coverage

  • Two complete toilet makeovers with waterproofing

  • Coordinated material selection across spaces

  • Single project management for efficiency

4-Room Kitchen + 2 Toilets Resale Package - Standard (Hacking): $24,990

Full demolition and reconstruction approach adding comprehensive hacking work for kitchen and both toilets, enabling complete layout changes.

4-Room Kitchen + 2 Toilets Resale Package - Premium (Overlay): $25,490

Top-tier materials and expanded coverage with Tier 2 quartz, premium fixtures, and enhanced hardware across all three spaces.

4-Room Kitchen + 2 Toilets Resale Package - Premium (Hacking): $25,990

Most comprehensive whole-home wet area transformation combining complete demolition, premium materials, extended coverage, and professional coordination for maximum quality.

Untuk perencanaan renovasi menyeluruh, kunjungi Singapore Renovation Complete Guide 2025 yang mencakup strategi untuk HDB, BTO, dan condo renovation.

Overlay vs Hacking: Which Approach Do You Need?

Overlay works best when your kitchen structure remains sound but surfaces look dated. This method installs new cabinets over existing bases without demolishing floors or walls, completing in 3-4 weeks at lower cost. Resale flats under 10 years old with no water damage represent ideal overlay candidates.

The overlay method preserves structural elements while completely refreshing aesthetics. New cabinets mount over existing bases, countertops replace old surfaces, and updated hardware transforms functionality. This approach saves approximately $4,000-$5,000 compared to full hacking while delivering dramatic visual improvements.

Full hacking makes sense for kitchens older than 15 years, properties with hidden water damage, or homeowners wanting complete layout changes. The additional $400 investment enables demolition to foundation level, installation of modern waterproofing membranes, reconstruction of level bases, and complete retiling before cabinet installation.

Complete hacking addresses underlying problems that overlay cannot fix. Aging plumbing systems get replaced with modern materials, proper waterproofing prevents future moisture issues, and level foundations ensure cabinet alignment. This comprehensive approach extends kitchen lifespan by 15-20 years.

The 5-7 week timeline for hacking approaches accommodates proper waterproofing curing time and multi-phase construction. While taking longer, this comprehensive method prevents future water damage issues that could cost thousands in repairs.

Professional contractors can assess your kitchen condition during initial consultations, recommending the appropriate approach based on structural integrity, age, and renovation goals.

How Long Does Kitchen Renovation Take?

Timeline expectations depend on renovation scope and method chosen:

BTO Cabinet Installation: 2-3 weeks from start to completion. Since structural elements remain intact, work focuses primarily on cabinet fabrication, installation, and countertop templating. Most BTO cabinet projects complete within this accelerated timeframe.

Complete BTO Packages: 3-4 weeks including all plumbing and electrical connections. The absence of demolition work allows faster progression through installation phases.

Resale Overlay Packages: 3-4 weeks total duration. Installing new cabinets over existing structures eliminates demolition and reconstruction phases, enabling faster completion similar to BTO timelines.

Resale Hacking Packages: 5-7 weeks for complete transformation. Timeline includes:

  • Demolition phase: 3-5 days

  • Waterproofing and screeding: 5-7 days (includes curing time)

  • Tiling works: 5-7 days

  • Cabinet installation: 7-10 days

  • Final touches and inspection: 2-3 days

Combined Kitchen and Toilet Projects: 6-8 weeks due to coordinated scheduling across multiple wet areas. Work proceeds in phases to optimize tradesperson efficiency and ensure proper curing times for waterproofing applications.

Weather conditions, material supply delays, and HDB permit processing can impact schedules. Building buffer time into your moving plans prevents stress if minor delays occur. Reputable contractors provide guaranteed completion timelines within package agreements, with delay penalties protecting homeowner interests.

What Questions Should You Ask Before Choosing a Package?

About Scope and Inclusions:

  • What exactly does the quoted price cover from start to finish?

  • Which items are owner-supplied versus contractor-provided?

  • Does the package include HDB permit application and approval?

  • What happens if we want to change materials after signing?

  • Are site protection, debris removal, and final cleaning included?

About Materials and Quality:

  • What brands and thicknesses are used for cabinet construction?

  • Which quartz tiers are included, and what are upgrade costs?

  • How many laminate options can we choose from at base pricing?

  • What type of soft-closing hardware comes standard?

  • Can we see samples before making final selections?

About Timeline and Warranty:

  • What is the guaranteed completion timeline for our package?

  • What penalties apply if the contractor misses the deadline?

  • How long is the warranty, and what exactly does it cover?

  • What process do we follow if defects appear after completion?

  • How quickly do you respond to warranty claims?

About Practical Concerns:

  • Can we live in the property during renovation?

  • What are typical working hours, and how will you minimize noise?

  • How will you protect other areas from dust and debris?

  • Who coordinates appliance delivery and installation timing?

  • How often will we receive progress updates?

Quality contractors provide clear documentation answering these questions before contract signing. Transparent communication during planning prevents misunderstandings during execution.

BTO vs Resale: Which Package Type Do You Need?

BTO kitchens come with functional structures that only need cabinet and countertop installation. The $5,590-$6,190 range delivers everything new homeowners need to create working kitchens without unnecessary structural work. Since plumbing, electrical, and tiling remain in good condition, focusing budgets on quality cabinets and durable countertops makes financial sense.

Standard packages suit minimalist homeowners or those allocating more budget toward living areas. Premium options benefit design enthusiasts wanting elevated finishes or specific color schemes matching their overall BTO aesthetic.

Complete BTO packages ranging $11,290-$11,790 provide turnkey solutions including all connections and installations. These comprehensive options suit homeowners preferring single-contract convenience over coordinating multiple service providers.

Resale kitchens require assessment before determining overlay versus hacking needs. Properties under 10 years old with cosmetic wear but sound structures maximize value with $13,990 overlay packages. The $4,000-5,000 savings versus hacking allows budget reallocation toward premium appliances or enhanced materials.

Flats older than 15 years typically benefit from complete hacking approaches despite higher costs. Hidden water damage, deteriorating plumbing, and outdated waterproofing standards justify the additional $400-500 investment. Comprehensive rebuilding provides peace of mind through modern construction standards and proper moisture protection.

Cabinet-only resale packages starting at $5,590 suit homeowners with recently renovated kitchens needing only cabinet refreshment. This targeted approach updates the most visible kitchen element while preserving functional plumbing, electrical, and tile work.

Untuk informasi detail tentang renovasi HDB kitchen, baca HDB Kitchen Renovation SG 2025: Cost Guide from $5590 yang mencakup permits, layouts, dan contractor selection.

Can You Customize Materials Within Package Pricing?

Packages specify base material tiers with defined selections at quoted prices. Standard offerings typically include Tier 1 quartz (10-15 solid colors with subtle patterns), standard laminate ranges (30-50 options in common colors/wood-grains), and basic soft-closing hardware.

Upgrade paths enable customization without project-wide repricing:

  • Tier 2 quartz with marble-look veining and designer palettes: +$500-$800

  • Premium laminates beyond standard allowances: $60+ per piece

  • Branded hardware (Blum/Hettich systems): +$300-$600

  • Extended cabinet coverage (per additional foot): +$200-$300

  • Glass panel cabinet doors: +$150-$250 per door

  • Internal LED cabinet lighting: +$400-$600 per kitchen

  • Pull-out drawer systems and organizers: +$200-$400 per unit

Reputable contractors provide transparent upgrade pricing during design consultation. You see exactly what each enhancement costs before committing, enabling informed decisions aligned with your budget priorities. This structured approach prevents the vague "we'll see during renovation" responses that lead to budget overruns.

Standard laminate selections offer sufficient variety for most homeowners, featuring solid colors, wood-grain patterns, and basic stone-look finishes. Premium laminate upgrades access metallic finishes, high-gloss surfaces, and realistic timber replications that elevate kitchen aesthetics significantly.

Tier 1 quartz provides excellent durability and stain resistance in neutral color palettes. Tier 2 selections expand to dramatic veining patterns, bold colors, and distinctive designs that create statement countertops serving as kitchen focal points.

Do Kitchen Packages Include Appliances and Fixtures?

Most packages exclude appliances while including labor for installation. Hoods, hobs, ovens, and refrigerators remain owner-supplied items, allowing you to select brands, features, and price points matching your preferences.

This separation benefits homeowners wanting specific appliance features like induction cooking, convection ovens, or commercial-grade ventilation. Contractors coordinate installation timing during renovation schedules, ensuring appliances arrive when needed without premature delivery storage issues.

Kitchen sinks and taps similarly remain owner-supplied in most packages. Installation labor comes included, but fixture selection stays flexible. This approach allows homeowners to choose designs, finishes, and quality levels aligned with their aesthetic preferences and budget priorities.

Standard packages include basic electrical connections (typically 2-3 power points) and plumbing hookups for sink and dishwasher. Additional electrical points or specialized appliance connections may require upgrade charges clearly specified in quotations.

Tiles may be included or owner-supplied depending on package structure. Hacking packages sometimes include standard tile selections within quoted pricing. Other packages specify tile supply as owner responsibility with installation labor included. Clarify this detail during quotation discussions to avoid budget surprises.

For comprehensive understanding of what's included in various renovation scopes, review HDB Renovation Packages Singapore 2025 From $5590 which breaks down complete package inclusions.

How Do You Prepare Your Home for Kitchen Renovation?

One Week Before:
Book temporary accommodation if living on-site during renovation proves impractical. Families with young children, elderly members, or work-from-home arrangements benefit from short-term relocation to relatives' homes or serviced apartments. The 3-7 week renovation duration makes displacement worthwhile for comfort and project efficiency.

Arrange alternative cooking through meal delivery subscriptions, dining out budgets, or temporary pantry setups in other rooms. Plan grocery shopping accordingly, avoiding perishable stockpiling before refrigerator disconnection.

2-3 Days Before:
Clear the entire kitchen including cabinets, countertops, and appliances. Remove all items, cookware, and perishables to prevent damage from dust and debris. Label and store items systematically for easy unpacking after renovation completion.

Inform neighbors about upcoming renovation schedules and expected noise periods. Professional courtesy reduces complaints and maintains good relationships. Provide contact information for direct communication if disturbances become excessive.

Day Before:
Designate material storage areas for cabinets, countertops, and fixtures awaiting installation. Clear pathways ensure safe material delivery without damaging other home areas. Confirm contractor arrival times and site access procedures.

Protect adjacent areas from dust migration using temporary barriers or plastic sheeting if living on-site. Close internal doors to confine construction mess to kitchen areas.

During Renovation:
Schedule regular inspections at project milestones to approve works before progression. Address concerns immediately rather than discovering problems after completion when corrections become costly and disruptive.

Maintain open communication with project managers, asking questions and requesting clarifications whenever needed. Document progress with photos for future reference and warranty purposes.

What Warranty Coverage Should You Expect?

Standard industry warranties provide 12-month comprehensive coverage for workmanship and installation quality. This protection addresses cabinet alignment issues, soft-closing mechanism failures, laminate delamination, countertop crack problems, and plumbing leaks arising from installation errors.

Coverage typically includes:

  • Cabinet structure defects and alignment corrections

  • Hardware malfunctions (hinges, drawer runners, soft-closing systems)

  • Countertop installation issues and minor chip repairs

  • Plumbing leaks from faulty connections

  • Electrical connection failures

  • Tile cracking from poor substrate preparation (hacking packages)

Common exclusions:

  • Damage from homeowner misuse or accidents

  • Natural disasters and water damage from external sources

  • Unauthorized modifications by third parties

  • Normal wear and tear from daily usage

  • Defects in owner-supplied appliances or fixtures

Quality contractors provide written warranty documentation during handover. Document defects with photos immediately upon discovery, reporting them promptly per warranty terms. Most reputable contractors respond within 5-7 business days for warranty claims, scheduling repairs at mutually convenient times.

Warranty coverage typically begins from handover date and extends 12 months covering manufacturing defects and installation workmanship. Material warranties from manufacturers (quartz, laminate suppliers) may extend beyond installation warranty periods.

Common Kitchen Renovation Package Questions

Can I use my own contractor for certain works while keeping the package for others?

Most contractors require complete project control for warranty purposes. Splitting work between multiple parties creates liability confusion when defects appear. If you have specific tradespeople you trust, discuss options during initial consultations—some contractors accommodate hybrid approaches with clear scope delineation.

What happens if I want to change the plan midway through renovation?

Minor modifications typically accommodate with small cost adjustments. Major changes requiring demolished work may incur additional charges and timeline extensions. Finalize designs thoroughly before starting work to avoid expensive mid-project changes.

How do package prices compare to fully custom renovations?

Custom approaches typically cost 20-30% more than packages due to individual pricing for every element. Packages leverage bulk material purchasing and standardized processes reducing costs. For homeowners with very specific visions requiring bespoke solutions, custom approaches justify the premium.

Do contractors require deposit payments before starting work?

Industry standard involves 30-50% deposit upon contract signing, with remaining payments at project milestones. Typical payment schedules include:

  • 30% upon contract signing

  • 30% at demolition completion (hacking packages)

  • 30% at cabinet installation completion

  • 10% upon final handover and inspection

Avoid contractors demanding full payment upfront—this payment structure provides no incentive for quality completion or timeline adherence.

What if we discover hidden problems during renovation?

Reputable contractors notify you immediately when unexpected issues arise during demolition or hacking. Water damage repairs, structural reinforcements, or additional waterproofing may incur extra charges. Get written quotations for additional work before proceeding rather than accepting verbal estimates.

Finding the Right Kitchen Package for Your Home

Start by assessing your current kitchen condition honestly. Cosmetic issues like outdated cabinets and worn surfaces suit overlay approaches, while structural concerns, water damage, or layout inefficiencies justify full hacking investments.

Consider your timeline needs when selecting packages. Urgent move-in deadlines favor faster overlay methods (3-4 weeks), while flexible schedules allow comprehensive hacking approaches (5-7 weeks) delivering complete transformations.

Evaluate long-term usage patterns to justify premium investments. Daily cooking with multiple household members benefits from enhanced hardware and expanded storage, as frequent usage accelerates wear on budget components. Lighter kitchen usage by couples or individuals eating out frequently may find standard packages entirely adequate.

Request detailed quotations from 3-4 contractors comparing identical scopes. Look beyond pricing to evaluate warranty terms, project timeline guarantees, communication responsiveness, and portfolio quality demonstrating execution capabilities.

Check contractor credentials including HDB licensing, BCA registration, and past customer reviews. Established contractors with 10+ years experience navigating local regulations, material supply chains, and common renovation challenges deliver more reliable outcomes than newer companies.

Visit completed projects if contractors offer site tours. Seeing finished quality firsthand reveals more than photos, particularly regarding cabinet alignment, countertop seam quality, and overall workmanship standards.

Untuk memilih contractor terpercaya, baca panduan Top HDB Renovation Contractors 2025: Costs & Reviews Guide yang mengulas contractor licensing, portfolio review, dan customer testimonials.

Smart Storage Solutions for Singapore Kitchens

Singapore's compact kitchen spaces demand efficient storage strategies maximizing every centimeter:

Vertical Storage Optimization:
Extend cabinets to ceiling height capturing typically wasted vertical space. This approach increases storage capacity 30-40% without expanding floor footprint. Upper cabinets accommodate less-frequently used items like seasonal cookware and serving platters.

Pull-Out Systems:
Deep cabinet drawers with full-extension runners prevent items from becoming lost in cabinet depths. Soft-closing mechanisms protect cabinet boxes from impact damage while providing smooth operation. These systems work particularly well for pots, pans, and small appliances.

Corner Solutions:
Blind corner spaces transform into accessible storage through rotating carousel systems or pull-out magic corner units. These innovative solutions maximize typically wasted corner areas while keeping items organized and visible.

Toe-Kick Drawers:
The space beneath base cabinets becomes functional storage for flat items like baking sheets, cutting boards, and serving trays. This space-saving feature adds storage without affecting kitchen aesthetics or reducing walking space.

Internal Drawer Dividers:
Customizable divider systems organize utensils, cutlery, and cooking tools efficiently. These accessories prevent items from shifting during drawer operation while maximizing usable space.

Untuk strategi space planning lengkap, lihat HDB Kitchen Renovation Guide: Tips and Strategies yang mencakup layout optimization untuk semua HDB flat types.

Get Your Kitchen Renovation Started

Ready to transform your kitchen with transparent pricing and guaranteed quality? Visit renovationcontractorsingapore.com/collections/kitchen-packages to explore all available packages with detailed specifications and real pricing.

Free Consultation Includes:

  • Professional kitchen assessment and measurements

  • Package recommendation based on renovation scope

  • 3D design rendering with layout options

  • Detailed quotation with all inclusions and exclusions

  • Material selection guidance within package tiers

  • Timeline confirmation for project completion

  • Answers to all renovation questions and concerns

All packages include 12-month comprehensive warranty and guaranteed completion within stated timelines. Professional project management coordinates all trades efficiently, ensuring quality execution without the stress of managing multiple contractors independently.

Transform your kitchen with Singapore's trusted renovation contractor, backed by proven track record and thousands of satisfied homeowners. Contact RCS today for your free consultation and discover how professional renovation can enhance your daily living experience.

Updated on  
Contact RCS Team
RCS – Renovation Contractor Singapore
HDB Licensed • BCA Registered • bizSAFE Level 3 • PMI Member

What Our Customers Say

"

Ismail was moving over into a bigger place from his existing. And he is a family friend. His project was just after covid, where we were still in the midst of restrictions. Having a great team helps with delivering projects on time.

Click for more
"

Newlyweds Kaysen & Nadia, had just bought their 3 room BTO resale, and we revamped the whole house for them. From hacking, combining their dining, kitchen and service yard. Tiling for their toilets and whole house vinyl flooring. This project was a little emotional for us as one of them had gone through a renovation nightmare before, when his parents renovated recently. We had assured him that we were not a fly by night contractor, and our Project Manager had personally committed to an undertaking to complete the project within the agreed timeline.

Click for more
"

Khairil is an old friend. We've known each other since primary school. When he wanted to spruce up his place for last raya, he reached out to us for a quote. Initially he wanted to change to a new kitchen as well, but decided against it as it was too near to Raya. So we proceeded for hacking of existing laminate flooring for the whole house, painting, and herringbone vinyl flooring for the whole house. This was done while the place is full up to the brim with furniture. And we managed to pull this off in 1 week through a tightly managed project schedule. Reach out to us and see how you can benefit from our expertise.

Click for more
"

Jolene's husband, Kumar had contacted us through Facebook. We discussed a little bit about their needed renovation, and arranged to meet at the unit to finalize the works. Kumar had put his trust in us since the beginning, as he had sensed we were sharing truthfully about the renovation even when the contract was not awarded to us yet. He appreciated us for this, and we completed his resale EA in Jurong West within the agreed timeline even though there were delays caused by their vanity supplier. They were a very pleasant couple to work with, and we are very happy to have helped them realise their dream home.

Click for more
"

Lennie was a mentor when we joined BNI Champions. Coincidentally, his in laws needed to spruce up their unit for rental. We started by clearing the space out, revamping the whole kitchen, rewiring the unit and finishing it off with a fresh coat of paint. Happy and grateful that this had helped them get a very good price for their rental. Not forgetting of course, the agent that was tasked to find the perfect tenants did an amazing job marketing the unit.

Click for more
"

Puan Liza was helping her aunt to search for a renovation contractor. Her aunt needed to update her Ikea kitchen that is already failing. The project was nearing end of the year period, and we helped them to create the quote within 24hrs. They were decisive and we scheduled for the work. In the midst of the project, her aunt decided to also add flooring works for her kitchen. And everything was done within 1mth 1wk, with additional glass backing works as well. Another happy handover achieved.

Click for more
×

Your product grid title

Browse All