Bishan Ridges completion date: an empty high-floor HDB flat at handover with bare screed floor and a key-collection checklist

Bishan Ridges Completion Date: Q2 2026 + Reno Cost

• By SingRank Singapore — min read
Contact Us via WhatsApp

Disclaimer: This article is published by the RCS Team for general informational purposes only and does not constitute professional advice.

HDB's launch estimate for the Bishan Ridges completion date was the second quarter of 2026. That quarter has passed and HDB has issued its move-in booklet, so plan from your own key date, your Optional Component Scheme (OCS) choice and your block. In our check of 22 pages on 6 October 2026, 3 of 22 contradicted HDB's brochure on basic facts.

Bishan Ridges completion date: an empty high-floor HDB flat at handover with bare screed floor and a key-collection checklist
Illustration of an empty high-floor HDB flat at handover. Bishan Ridges has 1,502 flats in 6 blocks of 22 to 39 storeys (HDB sales brochure, 2020).

Facts, HDB rules and package prices checked on 6 October 2026 against HDB's sales brochure, HDB's move-in booklet, HDB's renovation pages and our own product pages.

This page is for the month after handover, whether you already hold keys or are still waiting for your appointment letter. If you are tracking a different project, our HDB BTO completion date tracker lists the others.

Key Takeaways

Question Short answer Source
When was it due? Second quarter of 2026, HDB's estimate at the November 2020 launch The Straits Times, 2020
Is it delayed to October 2026? We found no HDB notice saying so; October comes from a tracker's Covid buffer Tracker page, checked 6 Oct 2026
Can I trust what I read online? Check first: 3 of 22 pages contradict HDB's brochure, and the 11 that give a date offer 6 different answers Our page census, 6 Oct 2026
What is in the project? 1,502 flats in 6 blocks of 22 to 39 storeys; 1,222 of them are 4-room HDB sales brochure, 2020
What decides my scope? Whether you opted into the Optional Component Scheme for floors, doors and sanitary fittings HDB sales brochure, 2020
Which clock matters now? Your own key date: report defects within 1 month, DLP runs 1 year HDB, defects in new flats

What Is the Bishan Ridges Completion Date?

HDB's expected completion date at launch was the second quarter of 2026. When HDB put the project on sale in November 2020, The Straits Times reported:

"The biggest project is Bishan Ridges, where 1,502 two-room flexi, three-room and four-room flats are on offer. [...] The estimated completion date is in the second quarter of 2026."

What has happened since is clearer from HDB's own paperwork than from any tracker. HDB has published a Bishan Ridges move-in booklet, copyright 2026, covering renovation, defects and the MOP. It explains that the project's Building Service Centre opens once the first keys are issued and runs for a year. A resident blog in Ang Mo Kio reported a household collecting Bishan Ridges keys in April 2026. That is one household's account, not an HDB schedule.

We found no HDB announcement of a delay to October 2026. That month comes from a project tracker. It lists an estimated TOP of 1 June 2026, adds a possible Covid delay of up to four months to reach 1 October 2026, and still shows the project as 100% complete. A buffer is not a notice.

HDB does not print a TOP day or a key-collection calendar for Bishan Ridges on any page we could open, so we won't invent one. Your own record is the one that counts. HDB's MyNiceHome FAQ points owners to the e-Service HDB calls Check Application for New Flat Purchase for the latest probable completion date (PCD), and says you are invited to collect keys when your block is completed. For how PCD, TOP and keys differ, see HDB probable completion date explained.

Why Do Pages Disagree About Bishan Ridges?

Because most of them were written from other pages, at different times, and few go back to HDB's brochure. We tested that. On 6 October 2026 we ran six fixed searches for the project, kept one page per website, and read 22 of them against the brochure HDB published in November 2020.

3 of 22 pages stated at least one basic fact that contradicts the brochure. One interior-design guide describes about 1,100 units in 10 blocks of 14 to 17 storeys, with 5-room and 3Gen flats. HDB's brochure has 1,502 units in 6 blocks of 22 to 39 storeys, and no 5-room or 3Gen flats at all. A 2020 news round-up listed the flat types as "2-room Flexi, 4-, and 5-room". A renovation portal showed design ideas for "this imagined 5-room BTO flat in Bishan Ridges".

Only 4 of the 22 stated all four basics correctly: units, blocks, storeys and flat types. The other 18 left at least one out or got one wrong.

The dates are messier still. 11 of the 22 pages give a completion or key timing, and between them they give 6 different headline answers:

Headline timing given Pages
Second quarter of 2026 4
June 2026 (one adds October 2026 as a possible delay) 2
October 2026 2
May 2026 1
Completed January 2026 1
"2026", no month 1

One forum thread goes further and estimates delivery of possession for 31 October to 30 November 2027. A buyer who reads three pages can come away with three different plans.

The gap that matters most for renovation is quieter. Only 1 of the 22 pages mentions the Optional Component Scheme, the opt-in that decides whether your living room has a floor. A guide written for a 5-room flat that does not exist can mislead a 4-room owner on area, carpentry and budget. Check the brochure first.

Which Block Are You In? What the 2020 Brochure Says

Bishan Ridges is overwhelmingly a 4-room project. HDB's sales brochure puts six blocks of 22 to 39 storeys between Bishan Street 13 and 14. Its block table splits the 1,502 flats like this:

Block Storeys 2-room Flexi 3-room 4-room Total
532A 39 - - 221 221
532B 33 - - 244 244
532C 22 / 30 156 54 56 266
535A 27 / 34 - - 230 230
535B 39 - - 301 301
535C 27 / 36 - 70 170 240
Total 156 124 1,222 1,502

By our count from the brochure's block table, 1,222 of the 1,502 flats, about 81%, are 4-room. Four of the six blocks, 532A, 532B, 535A and 535B, hold nothing but 4-room flats. The 124 3-room flats sit in 532C and 535C, and all 156 2-room Flexi flats are in 532C.

The brochure gives approximate floor areas of 93 sqm for a 4-room (90 sqm internal plus the air-con ledge) and 68 sqm for a 3-room (65 sqm internal). The 2-room Flexi flats come in 38 sqm and 48 sqm types. They are sold only to buyers aged 55 and above, each with a short lease of 15 to 45 years. We have no 2-room Flexi package, so we give no price for them.

What Did HDB Hand Over, and What Was Optional?

Every 3- and 4-room flat came with tiles in the wet areas. Living, dining and bedroom floors, internal doors, and basin and shower fittings were optional. The brochure is plain about the scheme: "When a flat buyer opts in for the OCS, the cost of the optional components will be added to the flat price."

Item, 3- and 4-room In every flat Only with OCS
Bathroom, kitchen and household shelter floor tiles; service yard (4-room) Yes
Bathroom and kitchen wall tiles Yes
Living and dining floor: polished porcelain tiles with UPVC skirting Yes
Bedroom floor: vinyl strip flooring with UPVC skirting Yes
Bedroom doors and bathroom folding doors Yes
Wash basin with tap mixer, shower mixer and set Yes
Water closet suite, locksets, clothes drying rack Yes
Gas services, concealed wiring incl. water heater and air-con points Yes

Two items are missing from both columns: kitchen cabinets and a water heater. The 3- and 4-room specification lists neither, only the electrical points for a heater and air-conditioning. Whatever you chose under OCS, the kitchen has no cabinets and the heater is your job.

3-room owners get one more choice. HDB designed the 3-room with a combined kitchen and utility space, and its brochure suggests a partition between the two as one option. Your purchase documents, not this page, say whether you opted into OCS. Check them before you ask for quotes.

Which RCS Package Fits Your Bishan Ridges Flat?

Match the package to what HDB left in your flat first, and to your budget second. All prices below were read on our product pages on 6 October 2026.

Your flat at keys Package From
4-room, OCS floors and doors installed 4-room Move-In BTO package S$7,390
4-room, no OCS floors, vinyl wanted 4-room Bare Unit BTO package, vinyl S$14,990
4-room, no OCS floors, tiles wanted 4-room Bare Unit BTO package, tiles S$16,990
3-room, OCS floors and doors installed 3-room Move-In BTO package S$7,290
3-room, no OCS floors, vinyl wanted 3-room Bare Unit BTO package, vinyl S$12,990
3-room, no OCS floors, tiles wanted 3-room Bare Unit BTO package, tiles S$14,990
Any flat, kitchen only Kitchen Cabinet BTO package S$5,490

The Move-In packages fit an OCS flat because they cover the main gaps HDB leaves: 10ft of bottom and top kitchen cabinets with a quartz top, sink and tap, a 15L storage heater installed, hood and hob installed (no gas connection), and paint for the whole flat. The Bare Unit packages add what a non-OCS flat lacks. The 4-room vinyl package lays screed and 5mm vinyl over living, dining and bedrooms up to 700 sqft, plus the same 10ft kitchen. The 3-room versions cover 500 sqft.

On our prices, skipping the OCS floors moves a 4-room from the Move-In package at S$7,390 to a Bare Unit package at S$14,990 or S$16,990, a gap of S$7,600 to S$9,600. That gap is between our two packages, not HDB's OCS charge, which the brochure does not print.

If your OCS tiles are not to your taste, HDB's building-works rules leave more than one route. Laying vinyl, carpet or linoleum needs no permit. Laying a new floor finish over the existing one with adhesive also needs no permit, but only where there is just one existing layer of floor finishes, counting the cement screed, and the new finish plus adhesive is no more than 13mm thick. Replacing tiles needs a permit, and floor finishes plus screed must not exceed 50mm. The household shelter is stricter: there, HDB permits only one layer of floor finishes. Whether your existing floor allows an overlay is worth confirming on site before you pick a finish; a site consultation is S$150 an hour, offset if you engage us for the works.

Four HDB Clocks That Start at Key Collection

Once your keys are out, four HDB limits set the order of your renovation. None of them depends on the project's TOP month.

Clock What HDB says What it means at Bishan Ridges
Defect reporting Report items within 1 month of getting your keys, and before any renovation starts Inspect and report before the first hack or drill
Defects Liability Period 1 year, counted from your key-collection date Your own key date plus one year, not your neighbour's
Permit window Works done within 3 months of the permit date for newly completed blocks; 1 month for existing blocks Book materials before the permit, not after
Bathroom finishes 3-year restriction on removing wall and floor finishes in newly built flats Plan bathrooms around HDB's tiles for now

The defects rules come from HDB's page on defects in new flats, which explains why the order matters: report first, and nobody has to investigate whether a defect came from HDB's construction or from your renovation. After the year ends, HDB says you can engage a repair contractor yourself. During that year, HDB's booklet sends defects in HDB-provided items to the Building Service Centre. Our BTO key collection checklist covers the inspection itself.

The permit windows come from HDB's renovation rules. HDB does not say on that page which window applies to a given Bishan Ridges permit, so check yours when it is issued. The same page sets the hours: general works 9am to 6pm on weekdays and Saturdays; restricted works such as removing finishes, cutting tiles and heavy drilling only 9am to 5pm on weekdays. In blocks of up to 39 storeys, plenty of neighbours share your corridor and lifts. More in our guides to the HDB renovation permit and HDB drilling and renovation hours.

What Must Stay Put in a Bishan Ridges Flat?

Four things limit layout ideas before any designer draws a line.

The household shelter. The brochure says its walls, ceiling, floor and door must not be hacked, drilled, altered or removed. Storage ideas that respect that are in our household shelter guide.

The sanitary stacks. They are exposed, and in 3- and 4-room flats they sit at the service yard, the air-con ledge, or both. Carpentry goes around them.

Drywall partitions. The brochure lists drywall among the wall systems. HDB's MyNiceHome FAQ says drywall can hold common fixtures such as cabinets when the right anchors are used. It also says equipment over 150kg needs HDB's approval first. Tell your carpenter which walls are drywall before wall cabinets go up.

The fire alarm. HDB's booklet asks you to cover the smoke alarm with a plastic sheet during renovation to keep dust out. Take the cover off when the work is done.

What to Do Before Your Contractor Starts

  1. Find your own key-collection date. If you have no appointment yet, look up the latest PCD in the e-Service HDB calls Check Application for New Flat Purchase.
  2. Pull out your purchase documents and confirm whether you opted into the Optional Component Scheme.
  3. On handover day, inspect every tile, door and fitting HDB installed. Report items within one month, before any works, as HDB's defects page asks.
  4. Note your block and flat type from the brochure table above. Ignore any page that offers a 5-room or 3Gen layout for Bishan Ridges.
  5. Choose the package that matches your OCS answer, then ask for a site check of floors and walls.
  6. Apply for permits only when materials are lined up, because newly completed blocks get three months.
  7. Leave the bathroom wall and floor finishes in place for now, and plan any bathroom changes around the three-year rule.
  8. Sequence the trades. Our HDB renovation sequence sets out the order.

Everything here assumes a flat collected straight from HDB. For the wider town, including older resale blocks, see our Bishan HDB renovation guide. If you are also watching another Bishan project, our Sin Ming Residences completion date page covers it. MacPherson Weave, where floors were optional too, shows the same OCS decision a year further on.

We are an HDB-licensed renovation contractor (Licence HB-11-5877Z), established in 2017, listed in HDB's Directory of Renovation Contractors and bizSAFE Level 3 certified. HDB's rules say you may only engage contractors from that directory. More about RCS.

Waiting on a Different Project?

This page covers Bishan Ridges only. If your keys are for another BTO, start from its own page: the Tengah Parc Meadow completion date, the Redhill Peaks completion date (with Berlayar Residences), the Tengah Plantation Edge completion date, the Queen's Arc completion date or the Keat Hong Grange completion date.

Still Weighing Floors and Timing?

If you are not ready to award work, try Ai-Deal, our own AI renovation assistant (currently in beta). It answers questions on HDB rules, permits and budgeting, and is free to use. Ask Ai-Deal about OCS, floors and order of works before you take quotes.

Frequently Asked Questions

How do I check the BTO completion date and key date for Bishan Ridges?

Sign in to the e-Service HDB calls Check Application for New Flat Purchase. The MyNiceHome FAQ names it as the place for the latest probable completion date. HDB calls the PCD an estimate and says you will be invited to collect keys when your block is completed. Your appointment letter beats any tracker or article, including this one.

What is a TOP date, and is it my key date?

No. A TOP is a building milestone, and keys follow it, block by block, by appointment. Pages that print one date for all of Bishan Ridges are estimating a schedule HDB has not published for the project. Plan your defect checks, permits and contractor from the date on your own key-collection appointment, not from the project's headline month.

Can I start renovation before HDB completion?

Works start after you hold the keys, and HDB wants defects reported first. Its defects page asks owners to report within a month of getting the keys, and before any works. What you can do earlier is decide your OCS-based scope, take quotes and line up materials, so the permit's three-month clock is not wasted.

When does the Bishan Ridges MOP end?

Five years after your own key collection. HDB's Bishan Ridges booklet gives the MOP as 5 years, starting "from date of key collection". A flat collected in mid-2026 therefore reaches its MOP in mid-2031. The booklet also says renting out the whole flat is not allowed during the MOP.

Method

On 6 October 2026 we ran six fixed searches ("bishan ridges completion date", "bishan ridges bto", "bishan ridges key collection", "bishan ridges top date", "bishan ridges renovation" and "bishan ridges") through a self-hosted metasearch engine. We kept the first page from each website and dropped government documents, our own pages, social video, single listings and pages not about the project. That left 25 pages. Three could not be read, leaving 22.

Each page was fetched with a named user-agent that respects robots.txt, then read in full by hand against HDB's November 2020 brochure for four basics: units, blocks, storeys and flat types. We also copied any completion or key timing word for word. The plan and collector were hashed before the first search, and every coding correction is logged.

Limits

One day, one metasearch engine, 22 pages: not Google's exact results, and not every page on the web. We coded the one page each site showed, and one person did the coding. One page we could not open showed 1,522 units in its search summary; it is not counted. The brochure is HDB's 2020 statement and HDB may change details, so "contradicts" means disagrees with the brochure. HDB's 2026 move-in booklet repeats the same 1,502 flats in 6 blocks of 22 to 39 storeys.

Cite this

RCS (Renovation Contractor Singapore). "Bishan Ridges fact-page census." Data collected 6 October 2026; published 9 October 2026. Canonical source: this page. Dataset version 1.0: 25 pages in the frame, 22 coded; anonymised CSV: download the CSV.

Disclaimer: published for general information, not professional advice. Renovation scope, permits and costs vary by unit and by HDB approval, and package prices may change after publication. HDB has not published an exact Bishan Ridges completion date or key-collection schedule, so rely on your own records and confirm your flat's fittings before budgeting. Last reviewed: 6 October 2026.